Le Lézard
Classified in: Environment
Subjects: Photo/Multimedia, Product/Service

Greenlane Announces 280-mile Corridor of Commercial EV Charging Stations from Los Angeles to Las Vegas


As the demand for efficient, reliable electric vehicle charging and hydrogen refueling infrastructure grows along the nation's freight corridors, Greenlane today announced its first commercial EV charging corridor with more than 100 chargers, modern amenities designed to increase the comfort of drivers, resilience for high uptime and ultimately moving freight more efficiently. Greenlane is a joint venture between Daimler Truck North America LLC, NextEra Energy Resources, LLC, and BlackRock (through a fund managed by its Climate Infrastructure business). The new charging corridor along Interstate 15 aims to accelerate the rollout of carbon-neutral freight transportation with initial charging locations in Colton, Barstow and Baker, California. Over the next year, further locations will be added along the corridor, extending beyond Southern Nevada and to San Pedro in California.

"After considering various factors, such as truck telematics data, frequent freight routes and customer deployment strategy, the Greenlane team selected these three optimal locations for our first commercial charging corridor to accelerate the transition to zero emissions," said Patrick Macdonald-King, CEO of Greenlane. "The launch of this corridor not only marks a critical step in addressing the urgent need for publicly available, nationwide electric charging for commercial vehicles but will also serve as a model for the EV charging hubs of the future."

At full build the Colton site is planned to have over 60 chargers, including 400 kW Direct Current Fast Chargers (DCFC) to speed charging of medium- and heavy-duty zero-emission vehicles (ZEVs). More 200 kW DCFC charging options onsite will enable long-duration and overnight charging for heavy-duty tractors, medium-duty ZEVs and school buses. Greenlane will also deploy multiple passenger car charging stalls to support light-duty and passenger vehicles.

Later project phases will support both long-duration and overnight charging lanes for tractor-trailer combinations. The Greenlane site in Colton will also be future-proofed to accommodate the Megawatt Charging System (MCS) when commercially available.

"By using a predictive modeling tool to simulate truck traffic and energy flow at the site, we can determine how many chargers are necessary to meet the regional demand based on vehicle characteristics and departure and arrival times for vehicles hauling freight along this corridor," said Macdonald-King. "Our findings indicated that placing the three stations approximately 60 to 90 miles apart would maximize uptime for day-cab drivers by enabling shorter charging sessions at each stop and ultimately allowing customers to move freight confidently without any limitations."

Designed to upgrade and enhance the current rest stop experience, each Greenlane site will have wide pull-through lanes, allowing drivers to enter and exit the property quickly and easily. While waiting for vehicles to charge, drivers can access modern facilities, with restrooms and other amenities, including food and beverage options.

Greenlane aims to develop a nationwide network of commercial charging infrastructure locations across the U.S. The charging sites will also serve battery-electric passenger car and light-duty fleet customers and are designed to provide hydrogen refueling for commercial vehicles in the coming years.

Greenlane is targeting a spring groundbreaking on the Colton flagship site, aiming to open in late 2024. Located at the intersection of Interstates 10 and 215, the Colton hub will offer multiple ways for heavy-, medium- and light-duty ZEV drivers to charge their vehicles.

For more, visit www.drivegreenlane.com.

About Greenlane

Greenlane Infrastructure is a joint venture between Daimler Truck North America, LLC (DTNA), NextEra Energy Resources, LLC and BlackRock, through a fund managed by its Climate Infrastructure business. Greenlane's mission is to design, develop, install and operate a nationwide, high-performance zero-emission public charging and hydrogen refueling network for medium- and heavy-duty battery-electric and hydrogen fuel cell commercial vehicles. Greenlane addresses the urgent need for publicly available, nationwide electric charging infrastructure for commercial vehicles, especially for long-haul freight operations, and is a critical step toward the development of a sustainable zero-emission vehicle ecosystem across North America. For more, visit www.drivegreenlane.com.


These press releases may also interest you

at 10:30
Summit Energy, one of the Northeast region's premier solar installers, is pleased to announce its sponsorship of Interfaith Social Services 50th anniversary of its annual "Stop the Stigma" 5K held today, April 27 at the Kennedy Center in North...

26 avr 2024
International Battery Metals Ltd. (the "Company") is pleased to announce that it has completed a non-brokered private placement financing of up to 14,338,494  units (each a "Unit") issued at a price of CAD$0.784 per Unit for gross proceeds of USD...

26 avr 2024
GBLT Corp. ("GBLT" or the "Company") announces that minority shareholders have approved the voluntary delisting (the "Delisting") of the common shares of the Company from the TSX Venture Exchange ("TSXV").  Approval for the delisting was received at...

26 avr 2024
Lincoln Electric Holdings, Inc., today announced its participation in the following upcoming events with the financial community in the month of May: Oppenheimer 19th Annual Industrial Growth Conference Monday, May 6, 2024 10:30 am Eastern...

26 avr 2024
The Vinyl Institute, a U.S. trade association representing the leading manufacturers of vinyl, today commented on the Environmental Protection Agency's (EPA) denial of the Center for Biological Diversity's petition to classify discarded PVC as...

26 avr 2024
The Badger Meter, Inc. Board of Directors today declared a regular quarterly cash dividend of $0.27 per share to shareholders of record on May 24, 2024, payable June 7, 2024. About Badger Meter With more than a century of water technology...



News published on and distributed by: