Le Lézard
Classified in: Mining industry
Subject: ANALYSTS' COMMENTS

Alaska Energy Metals Intersects 317.2 Meters Grading 0.34% Nickel Equivalent, Confirming Mineralization Along 860 Meters of Strike Length at the Nikolai Nickel Project, Alaska


HIGHLIGHTS

Alaska Energy Metals President & CEO Gregory Beischer commented: "These two holes further increase the drilled strike extent of the Eureka Zone to 860m. With results from the remaining two drill holes anticipated soon, we can begin calculating an updated Inferred Resource and complete metallurgical studies. Drilling results are consistent with historical drill holes, which intermittently trace out a strike extent of more than 10 kilometers for the mineralized zone. The nickel?copper sulfide mineralization is remarkably homogeneous."

VANCOUVER, British Columbia, Dec. 05, 2023 (GLOBE NEWSWIRE) -- Alaska Energy Metals Corporation (TSX-V: AEMC, OTCQB: AKEMF) ("AEMC" or the "Company") today announced assay results from drill holes EZ-23-004 & EZ-23-006.

The holes were drilled as part of the Company's 2023 exploration program at its 100% owned Nikolai Nickel Project in Central Alaska (Figure 1). Eight diamond drill holes were drilled during the campaign, with results from six holes now received and results from two holes pending.


Figure 1. Nikolai Project - Property Location Map

SUMMARY

To date, AEMC has received assay results for six of the eight drill holes completed during the 2023 exploration campaign. Assay results for EZ-23-001 & EZ-23-002 and drill hole locations for the 2023 exploration campaign can be found in AEMC's October 16, 2023 press release. Assay results for EZ-23-003 & EZ-23-005 can be found in AEMC's October 30, 2023 press release.


Figure 2. Drill hole location map showing estimated true thicknesses, calculated NiEq grades, surface geology and surface trace of Eureka Zone 2 mineralization. PNI and FL drill assay results were reported by Pure Nickel Inc. in a press release dated October 29th, 2013. The Company's Qualified Person has independently verified the assay data reported by Pure Nickel Inc. and has determined the quality assurance and quality control data to be acceptable.

HOLE EZ-23-004 SUMMARY

Table 1. Significant Intersections from EZ-23-004 & EZ-23-006



Figure 3. Cross section through EZ-23-004. Location of section line A-A' displayed on Figure 2. The Main Eureka Zone (EZ2) has a higher-grade core of 0.40% NiEq over 89.4m estimated true thickness within an envelope of lower grade (0.30-0.32% NiEq) metal concentration, for an estimated true width of 304.9m. Note: Chrome and iron are reported in the drilled interval but are not included in the NiEq calculation.

HOLE EZ-23-006 SUMMARY


Figure 4. Cross section through EZ-23-006. Location of section line B-B' displayed on Figure 2. Note: Chrome and iron are reported in the drilled interval but are not included in the NiEq calculation.

Core Processing & Quality Assurance and Quality Control (QA/QC):
AEMC adheres to stringent Quality Assurance ? Quality Control ("QA/QC") standards for its Nikolai Nickel Project to ensure the best practices for logging, sampling, and analysis of samples. For every 10 core samples, geochemical blanks, coarse reject or pulp duplicates, or Ni-Cu-PGE-Au certified reference material standards (CRMs) are inserted into the sample stream.

Drill core was flown by helicopter daily from drill sites and transported in secured wooden core boxes to the core logging facilities in Delta Junction, Alaska. Detailed logging and sampling data are captured on tablets using MX Deposit software. Samples are labeled by geologists and sawn in half with a diamond blade, with half being inserted into a labeled, bar-coded sample bag. The other half of the core is returned to the wooden boxes for archive. Samples are transported to SGS Laboratories in Burnaby, BC, utilizing a contracted transportation carrier.

Once samples are received at the laboratory, they are weighed, dried, and crushed to 75% passing 2mm. The samples are then riffle split and pulverized to 85% passing 75 microns. The samples are pulverized in a zirconia bowl, to prevent the contamination of Fe and Cr. Au, Pt, & Pd are analyzed by fire assay with ICP-AES finish (GE_FAI30V5). Ag is analyzed using a 4-acid digest with AAS finish (GE_AAS42E50). The remaining 30 elements are analyzed using sodium peroxide fusion with ICP-AES finish (GE_ICP90A50).

Qualified Person:
Gabriel Graf, the Company's Chief Geoscientist, is the qualified person, as defined under National Instrument 43-101 Standards of Disclosure for Mineral Projects, responsible for, and having reviewed and approved, the technical information contained in this news release.

For additional information, visit: https://alaskaenergymetals.com/ 

About Alaska Energy Metals
Alaska Energy Metals Corporation is focused on delineating and developing a large polymetallic exploration target containing nickel, copper, cobalt, chrome, iron, platinum, palladium, and gold. Located in central Alaska near existing transportation and power infrastructure, the project is well-situated to become a significant, domestic source of critical and strategic energy-related metals for the American market.

ON BEHALF OF THE BOARD
"Gregory Beischer"
Gregory Beischer, President & CEO

FOR FURTHER INFORMATION, PLEASE CONTACT:
Gregory A. Beischer, President & CEO
Toll-Free: 877-217-8978 | Local: 604-638-3164

Sarah Mawji, Public Relations
Final Edit Media and Public Relations 
Email: [email protected]

Some statements in this news release may contain forward-looking information (within the meaning of Canadian securities legislation), including, without limitation, that a) will receive all assay results for samples submitted, b) complete metallurgical and deportment studies, and c) calculate an inferred resource based on the drill holes reported. These statements address future events and conditions and, as such, involve known and unknown risks, uncertainties, and other factors which may cause the actual results, performance, or achievements to be materially different from any future results, performance, or achievements expressed or implied by the statements. Forward-looking statements speak only as of the date those statements are made. Although the Company believes the expectations expressed in such forward-looking statements are based on reasonable assumptions, such statements are not guaranteeing of future performance and actual results may differ materially from those in the forward-looking statements. Factors that could cause the actual results to differ materially from those in forward-looking statements include regulatory actions, market prices, and continued availability of capital and financing, and general economic, market or business conditions. Investors are cautioned that any such statements are not guarantees of future performance and actual results or developments may differ materially from those projected in the forward-looking statements. Forward-looking statements are based on the beliefs, estimates and opinions of the Company's management on the date the statements are made. Except as required by applicable law, the Company assumes no obligation to update or to publicly announce the results of any change to any forward-looking statement contained or incorporated by reference herein to reflect actual results, future events or developments, changes in assumptions, or changes in other factors affecting the forward-looking statements. If the Company updates any forward-looking statement(s), no inference should be drawn that it will make additional updates with respect to those or other forward-looking statements.

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this press release.

Photos accompanying this announcement are available at: 

https://www.globenewswire.com/NewsRoom/AttachmentNg/124ab5bf-2ad1-467e-ac1b-23c0f8368648

https://www.globenewswire.com/NewsRoom/AttachmentNg/b1685b83-65ee-4e7c-9990-59102631de77

https://www.globenewswire.com/NewsRoom/AttachmentNg/4982be5a-dbf7-45ab-b8ad-ce3ac82d3d94

https://www.globenewswire.com/NewsRoom/AttachmentNg/2497e678-a080-4931-a17c-b5a83b5132fd

https://www.globenewswire.com/NewsRoom/AttachmentNg/62c2aa85-fa40-4af3-a1ce-4749126ee1cc



These press releases may also interest you

at 17:35
Capstone Copper Corp. ("Capstone" or the "Company") announced the voting results from its 2024 Annual General and Special Meeting ("AGM") held May 3, 2024 in Vancouver, British Columbia. A total of 566,592,577 common shares were voted at the...

at 17:05
Global Helium Corp. ("HECO" or the "Company") is pleased to announce that, pursuant to the Company's stock option plan, it has granted incentive stock options to acquire up to 1,075,000 common shares of the Company to certain directors, officers and...

at 17:05
GMV Minerals Inc. (the "Company" or "GMV") is pleased to announce that it has filed permitting documentation with the Bureau of Land Management (BLM) for GMV's Daisy Creek lithium/uranium project in Lander County, Nevada.The...

at 17:00
Galiano Gold Inc. ("Galiano" or the "Company") advises its Annual General Meeting of shareholders ("AGM") will be held virtually on Thursday, June 13, 2024, at 10:00 am PDT. Shareholders who intend to participate in the AGM should refer to the...

at 17:00
Caterpillar Inc. will hold a virtual annual shareholder meeting on Wednesday, June 12, 2024, at 8 a.m. CDT. Shareholders owning...

at 17:00
TDG Gold Corp (the "Company" or "TDG") is pleased to announce that it has closed the second tranche of the non-brokered private placement previously announced on February 22, 2024, April 4, 2024, and April 11, 2024 (the "...



News published on and distributed by: