Le Lézard
Classified in: Mining industry, Business
Subject: MINING EXPLORATION UPDATE

Drilling significantly expands L65 deposit at Pine Point


TORONTO, ONTARIO--(Marketwired - Aug. 10, 2017) - Pine Point Mining Limited (TSX VENTURE:ZINC) (the "Company") is pleased to announce that the portion of exploration designed to expand the existing resource at the L65 open pit deposit at its Pine Point project in the Northwest Territories has significantly expanded the potential size and grade of the deposit. A total of 56 holes for a total of 5,906 metres have been drilled at L65 so far in 2017, in addition to the 29 holes previously drilled by former operators Cominco and Tamerlane.

"It is encouraging that the drilling to date at L65 has intersected grades well above the average grade of the deposit while at the same time expanding the size significantly. L65 had the lowest grade of the 10 deposits included in our Preliminary Economic Assessment released in April, and these higher assays in the western zone should help with the economics of the project," says Jamie Levy, President and Chief Executive Officer of the Company. "It should be noted that L65 is just the first of several deposits which have the potential for expansion."

Assays have been received for the first 38 drill holes. Several L65 holes have intersected significant mineralization as listed in Table 1 and a complete listing of all assays received to date is attached. (click here for complete composites).

 
Table 1: Significant Intersections L65 Deposit
 
HOLE ID   From (m)   To (m)   Width (m)   True Width   Pb %   Zn %   Pb+Zn %
L65-17-DBL-012   65.00   67.80   2.80   2.80   0.72   5.84   6.56
L65-17-DBL-014   62.00   65.70   3.70   3.70   0.96   5.03   5.99
L65-17-DBL-015   72.05   75.85   3.80   3.72   2.84   9.58   12.42
L65-17-DBL-016   66.45   76.05   9.60   9.60   1.89   8.09   9.98
L65-17-DBL-017   67.95   78.15   10.20   10.20   0.63   4.47   5.09
L65-17-DBL-018   68.00   75.40   7.40   7.40   1.85   6.77   8.62
L65-17-DBL-019   82.60   84.05   1.45   1.26   2.23   7.96   10.19
L65-17-DBL-019   86.75   88.85   2.10   1.82   2.43   20.60   23.03
L65-17-DBL-023   84.10   86.90   2.80   2.30   1.96   4.25   6.20
L65-17-DBL-025   70.50   73.50   2.65   2.41   8.98   14.74   23.72
L65-17-DBL-028   70.00   78.85   8.85   8.55   1.07   4.15   5.21
L65-17-DBL-029   63.85   74.00   10.15   9.80   1.40   4.70   6.11
L65-17-DBL-030   69.30   72.30   3.00   3.00   4.12   7.66   11.78
L65-17-DBL-035   76.15   79.00   2.85   2.34   1.75   7.96   9.71
L65-17-DBL-036   77.75   97.80   20.05   16.44   0.47   3.51   3.98
L65-17-DBL-036   77.75   83.40   5.65   4.63   1.46   7.85   9.31
L65-17-DBL-037   76.78   79.60   2.82   2.57   2.05   15.64   17.68
                             

The L65 deposit area is located in between four deposits previously outlined by Cominco: the M62/63, M64, M67 and K68 deposits (click here to see map). The current resource or past production of the deposits are listed in Table 2.

 
Table 2: Resources and Deposits in the L65 Area
 
Deposit   Tonnage   Lead %   Zinc %   Resource Type
M62/63   352,000   1.42   2.13   Measured Open Pit
M64   174,460   4.90   8   Past Production Open Pit
M67   1,365,000   0.80   3.55   Measured and Indicated Open Pit
L65   1,578,000   0.70   1.95   Measured and Indicated Open Pit
K68   1,193,000   0.81   2.77   Measured and Indicated Open Pit
Source: 2017 PEA Study
 

The program has been successful in extending the deposit to the west towards the K68 and M67 deposits, and the mineralization now extends for over 1,300 metres along strike as shown on the attached map. The mineralization is separated into two areas by a zone of weak mineralization into a smaller eastern zone and a larger western zone. It now appears that the L65 zone mineralization is part of a continuous system connecting all four deposits (M62/63, M64, M67 and K68) although areas of weaker mineralization exist between deposits.

Mineralization at L65 remains open in several directions (see map):

Almost all the gaps and open areas noted here are underlain by swampy ground and future drilling will have to await the 2018 January to March winter drill program. A new resource will be calculated for the deposit at after the next phase of drilling.

The L65 drilling was part of a larger program which has so far included a total of 111 drill holes completed by the Company in 2017 at Pine Point. Drilling has been suspended to allow crews to get caught up with a backlog of drill core waiting for logging and assaying, and is expected to continue in September. The other main focus of drilling has been confirming historical deposits in order to include them in the upcoming feasibility study. Results will be released when a significant number of additional assays have been received.

Pine Point Mining runs an industry standard QA/QC program of blanks, standards and duplicates to ensure quality control. 

Stanley Clemmer, a Qualified Person under NI 43-101, reviewed and approved the scientific and technical information presented in this press release.

About Pine Point Mining Limited

Pine Point Mining acquired a 100% interest in the Pine Point lead-zinc project in December, 2016. Since that time a positive Preliminary Economic Assessment (PEA) on the project showing a robust mining operation which, over a 13-year mine life, would have an after-tax net present value of $C210.5 million and internal rate of return of 34.5%, with a payback of 1.8 years. The study assumed a zinc price of US$1.10 per pound and a lead price of US$1.00 per pound, and used an exchange rate $C:$US of 0.75. The PEA was prepared by JDS Energy and Mining and is based on a mineral resource estimate for the Pine Point project published as a National Instrument 43-101 technical report with an effective date of April 18, 2017. To view further details of the study, please see the press release of April 18, 2017.

Forward-Looking Information

This release includes certain statements that may be deemed "forward-looking statements". All statements in this release, other than statements of historical facts, that address future production, reserve potential, exploration drilling, exploitation activities and events or developments that Darnley Bay expects are forward-looking statements. Although Darnley Bay believes the expectations expressed in such statements are based on reasonable assumptions, such statements are not guarantees of future performance and actual results or developments may differ materially from those in the statements. There are certain factors that could cause actual results to differ materially from those in forward-looking statements. These include market prices, exploitation and exploration successes, continued availability of capital and financing, and general economic, market or business conditions. Investors are cautioned that any such statements are not guarantees of future performance and actual results or developments may differ materially from those projected in the forward-looking statements. For more information on Darnley Bay, investors should review registered filings at www.sedar.com.

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.


These press releases may also interest you

at 12:00
Jean-François Verret has been appointed Vice President, Raglan Mine, marking the beginning of a new chapter for the site following the retirement of Pierre Barrette, who leaves us a remarkable legacy....

at 09:20
Western Alaska Minerals (the " Company " or " WAM ") is pleased to announce that it has closed its previously announced brokered offering by way of prospectus supplement dated April 22, 2024 to the Company's base shelf prospectus...

at 08:35
IperionX Limited is pleased to announce a significant milestone in the development of commercial-scale titanium metal manufacturing capabilities at the Titanium Manufacturing Campus in Virginia. The Hydrogen Assisted Metallothermic Reduction (HAMR...

at 08:30
Alphamin Resources Corp. (AFM:TSXV, APH:JSE AltX)( "Alphamin" or the "Company") announced today that its Board of Directors has declared a Final FY2023 cash dividend of CAD$0.03 per share on the common shares (approximately US$27.9 million in the...

at 08:30
Standex International Corporation  will announce its third quarter fiscal 2024 financial results on Thursday, May 2, 2024 after the close of the market and will broadcast its conference call live over the Internet at 8:30 a.m. ET on Friday, May 3,...

at 08:15
Mosaic Minerals Corporation ("Mosaic" or "The Company") is pleased to announce that it has entered into a letter of intent dated April 25, 2024 (the "LOI") with Castlebar Capital Corp ("Castlebar"). Pursuant to the LOI, Castlebar will be granted an...



News published on and distributed by: