Le Lézard
Classified in: Mining industry
Subject: NEW PRODUCTS/SERVICES

Mirasol Reports Extension of Ely Central Zone at Virginia Silver Project, Argentina


VANCOUVER, British Columbia, Jan. 25, 2022 (GLOBE NEWSWIRE) -- Mirasol Resources Ltd. (TSX-V: MRZ) (OTCPK: MRZLF) (the "Company" or "Mirasol") is pleased to report the initial results from the Phase III diamond drilling program at the Virginia Silver Project ("Virginia") in the province of Santa Cruz, Argentina. Virginia is operated by the Company and funded by Silver Sands Resources Corp. (CSE: SAND; OTCPK: SSRSF) under an option-to-purchase agreement (see News Release May 21, 2020). If the option is exercised, Mirasol will retain a 19.9% equity ownership in Silver Sands and a 3% NSR royalty (with a buydown to 2% for US$2M).

Continued drilling at Ely Central returned a broad interval of 33.8m at 88 g/t silver ("Ag") from 71.3m in hole EC-DDH-008, which successfully closes the gap between the mineralized structured delineated last season at Ely Central and Ely North. In addition, gold ("Au") mineralization was intercepted with hole EC-DDH-007 which returned 4.55m at 0.33 g/t Au and 30 g/t Ag from 173.65m (including 1.2m at 0.63 g/t Au and 26 g/t Ag). The presence of this gold pulse may indicate the introduction of a stronger and more consistent gold-rich pulse in the deeper parts of the Virginia vein system that could potentially add significant Au credits to the project.

Mirasol's President Tim Heenan commented: "We continue making good progress with Silver Sands at Virginia. The Ely Central zone now appears to be a continuous extension of the Ely North zone toward the south and represents a 300m lateral mineralized extension of this vein structure."

The Phase III drilling program comprised 20 core holes (2,932m) with 14 holes (2,437m) completed at Virginia and six holes (495m) at Santa Rita, located in the north of the property package. Results reported today are for the six holes completed at the Ely vein at the main Virginia zone. This follows the completion of nearly 6,000m of drilling last season, which both discovered new high-grade silver mineralization at the Ely Central target, and intercepted significant silver at the Ely North, Martina NW and Julia South targets (see News Release May 17, 2021).

Figure 1: Plan map with Phase III drill hole collar locations

Significant New Results (see Figure 2 and Table 1)

Focused drilling in recent campaigns at the Ely Central target has successfully extended the delineated silver mineralization between the Ely North and Ely South deposits (Refer to Amended NI 43-101 Technical Report filed February 29, 2016: "Amended Technical Report, Virginia Project, Santa Cruz Province, Argentina - Initial Silver Mineral Resource Estimate" prepared by D. Earnest and M. Lechner). Over the last field season, a 200m zone of mineralization at Ely Central was defined by holes EC-DDH-001, EC-DDH-003, EC-DDH-004, and EC-DDH-005 filling part of the gap between these deposits (news release May 17, 2021).

Hole EC-DDH-008 completed in the Phase III program was collared in the 120m long prospective gap that remained open along the vein structure between the Ely Central zone and the well-defined area of silver mineralization delineated by Mirasol in 2012. This mineralization is outside the current mineral resource at Ely North. EC-DDH-008 returned a broad interval of 33.8m at 88 g/t Ag and confirms the presence of a potentially continuous zone of silver mineralization over a strike of 800m from holes EN-DDH-001 to EC-DDH-004, of which only 200m is currently within the defined resource of the Ely North deposit.

Hole EC-DDH-007, drilled to depth below EC-DDH-003 which intercepted 9.98m at 560 g/t Ag (reported May 17, 2021), intersected a gold enriched zone running 4.55m at 0.33 g/t Au and 30 g/t Ag (55 g/t AgEq1) from 173.65m, including 1.2m at 0.63 g/t Au and 26 g/t Ag (73 g/t AgEq). Notably, this is the deepest mineralization encountered along the Ely structure and suggests a transition into a gold enriched zone at depth. This interval may represent the downward continuity of a previously identified gold anomaly drilled in EC-DDH-003 (1.25 g/t Au from 111m), indicating a potentially continuous and separate gold mineralizing event unrelated to the principal silver mineralization. Previously, the gold mineralization in the Virginia system was restricted to isolated occurrences that are now interpreted to represent leakage from a deeper sourced mineralizing event. Follow-up with deeper drill holes along the Ely structure is planned to test this newly identified gold potential.

Hole EC-DDH-009, located approximately 110m south of the previously southernmost hole EC-DDH-004 (9.6m at 639 g/t Ag - reported May 17, 2021) completed in Ely Central, and some 180m north of the border of the Ely South conceptual resource pit, returned 2.3m at 135 g/t Ag. This intercept indicates that further drilling may potentially close the gap between the Ely Central zone and the Ely South deposit.

Hole EN-DDH-005 was collared to the east of and drilled underneath hole EN-DDH-001 (reported May 17, 2021) and returned 9.95m at 37 g/t Ag including a narrower section of 0.35m with 73 g/t Ag. This intersection may represent a parallel structure on the east side and not the targeted downdip extension of the main structure intercepted in hole EN-DDH-001, which returned 7.47m with 91 g/t Ag, 70m north of the Ely North conceptual pit.

Figure 2: Rotated plan map on the Ely Central zone

About Mirasol Resources Ltd.

Mirasol is a well-funded exploration company focused in Chile and Argentina. Mirasol has seven partner-funded projects, with Newcrest Mining Ltd (Chile), First Quantum Minerals (Chile), Mine Discovery Fund (Chile), Mineria Activa (Chile), Silver Sands Resources (Argentina), Patagonia Gold (Argentina) and Golden Arrow (Argentina). Mirasol is currently self-funding exploration at Sobek (Chile), Inca Gold (Chile) and Sacha Marcelina (Argentina).

For further information, contact:

Tim Heenan, President
or
Jonathan Rosset, VP Corporate Development

Tel: +1 (604) 602-9989
Email: [email protected]
Website: www.mirasolresources.com

Qualified Person Statement: Mirasol's disclosure of technical and scientific information in this press release has been reviewed and approved by Tim Heenan (MAIG), the President for the Company, who serves as a Qualified Person under the definition of National Instrument 43-101.

QAQC: Mirasol applies industry standard exploration sampling methodologies and techniques. All geochemical rock and drill samples are collected under the supervision of the company's geologists in accordance with industry practice. Geochemical assays are obtained and reported under a quality assurance and quality control (QA/QC) program with insertions of controls (standards, blanks and duplicates, representing 5%, 4% and 5% of the samples respectively). Standards and blanks are inserted randomly in all drill core batches that are submitted to the laboratory, while duplicates are done on both the coarse reject (2.5%) and pulps (2.5%). Drill core samples have a minimum of 0.30m and a maximum of 2.00m in length. Samples are dispatched for analysis to Alex Stewart International Labs in Argentina, an ISO 9001:2015 accredited laboratory, which is independent from the Company. The samples are delivered to the laboratory by Mirasol personnel, a dedicated private courier, or by the dedicated laboratory pick-up service. Core diameter is generally HQ/HQ3 and samples are analysed by Fire Assay for both Au and Ag and also by ICP MS including a package of 48 elements.

Forward Looking Statements: The information in this news release contains forward looking statements that are subject to a number of known and unknown risks, uncertainties and other factors that may cause actual results to differ materially from those anticipated in our forward-looking statements. Factors that could cause such differences include: changes in world commodity markets, equity markets, costs and supply of materials relevant to the mining industry, change in government and changes to regulations affecting the mining industry and to policies linked to pandemics, social and environmental related matters. Forward-looking statements in this release include statements regarding future exploration programs, operation plans, geological interpretations, mineral tenure issues and mineral recovery processes. Although we believe the expectations reflected in our forward-looking statements are reasonable, results may vary, and we cannot guarantee future results, levels of activity, performance or achievements. Mirasol disclaims any obligations to update or revise any forward-looking statements whether as a result of new information, future events or otherwise, except as may be required by applicable law.

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

Table 1: Virginia Phase III Reported Drill Intercepts

Hole IDFromToInterval (m)1Ag g/t2Cut-off3
EC-DDH-006144.50145.000.508163
EC-DDH-00712.9513.550.607863
 80.6081.050.4530863
EC-DDH-00859.9560.300.3512363
 66.0099.8033.808863
including86.6087.400.80177150
including95.0095.350.35165150
EC-DDH-00962.5564.852.3013563
including63.2063.600.40290150
EN-DDH-00544.7045.000.306963
 67.6568.000.357363
EN-DDH-004No interval above cut-off

Notes:
1 Reported interval lengths
are downhole widths and not true widths.
2 Reported intervals are at the stated a cut-off grade of 63 g/t Ag and 150 g/t Ag.
Reported intervals may include up to a maximum of 2m individual section below cut-off grade and Ag grades are uncapped.
3 The intervals were selected using the 63 g/t cut-off grade used in the NI 43-101 resource estimate.

Table 2: Virginia Phase III Reported Holes Collar Location

Hole IdEastingNorthingElevation (m)AzimuthDipDepth (m)
EC-DDH-0062,428,7234,739,706998100-45206
EC-DDH-0072,428,9624,739,827992280-55209
EC-DDH-0082,428,9434,740,021990280-45182
EC-DDH-0092,428,8624,739,682992280-45101
EN-DDH-0042,428,8584,741,0811,06290-55230
EN-DDH-0052,428,9514,740,5991,036270-45179



1 Silver equivalent ("AgEq") is calculated using metal prices of US$ 1800/oz for Au and US$ 24/oz for Ag. Recoveries are assumed to be 100% as no metallurgical test data is available. The equation used is: AgEq g/t = Ag g/t + (Au g/t x 75)



These press releases may also interest you

at 12:22
The Annual General Meeting of Alfa Laval AB (publ) was held on Thursday, April 25, 2024, at Stadshallen in Lund. The Annual General Meeting was held under the chairmanship of Alfa Laval's Chairman of the Board Dennis Jönsson and the company's...

at 12:10
GLOBEX MINING ENTERPRISES INC. (GMX ? Toronto Stock Exchange, G1MN ? Frankfurt, Stuttgart, Berlin, Munich, Tradegate, Lang & Schwarz, LS Exchange, TTMzero, Düsseldorf and Quotrix Düsseldorf Stock Exchanges and GLBXF ? OTCQX International in the US)...

at 11:55
Introducing the latest innovation from Chroma - an ultra-low voltage DC electronic load that is designed to meet the needs of applications of [email protected] and [email protected]. This new instrument is the perfect solution for simulating the loading...

at 11:13
Torque Sensors Market is Segmented by Type (Reaction Torque Sensor, Rotary Torque Sensor, Super Acoustic Wave (SAW) Torque Sensor, Optical Torque Sensor), by Application (Automotive, Manufacturing, Aerospace and Defense, Healthcare) The Global...

at 11:00
RS, a trading brand of RS Group plc (LSE: RS1), a global provider of product and service solutions for industrial customers, offers an extensive selection...

at 10:01
The global Control Valve market is expected to grow from USD 10.0 billion in 2024 to USD 13.0 billion by 2029, registering a CAGR of 5.4% according to a new report by MarketsandMarketstm. The global market for control valves has experienced...



News published on and distributed by: