Le Lézard
Classified in: Covid-19 virus
Subjects: NEW PRODUCTS/SERVICES, MISCELLANEOUS

Endeavour Silver Reports Positive Drill Results for the Parral Project


(All amounts are in US dollars, unless otherwise stated)

VANCOUVER, British Columbia, Dec. 16, 2021 (GLOBE NEWSWIRE) -- Endeavour Silver Corp. (TSX: EDR, NYSE: EXK) is pleased to report positive drill results from its ongoing exploration program at the 3,432-hectare Parral project situated in the State of Chihuahua, Mexico. 

During the last 11 months, until the end of November, the Company has drilled over 14,000 metres in 59 holes targeting several areas along the La Colorada vein.

Highlights from Recent Drill Results

Abbreviations include: gpt: grams per tonne; Au: gold; Ag: silver; Cu: copper; Pb: lead; Zn: zinc; ETW: estimated true width; m: metre; HW: hanging wall. Silver equivalents are calculated at a ratio of 80:1 silver:gold, silver price of $23 per troy ounce, copper price of $3.45 per pound, lead price of $0.90 per pound and zinc price of $1.20 per pound.

"The Parral project continues to deliver great results," commented Dan Dickson, Chief Executive Officer. "Following limited drilling in 2020 due to the pandemic, it was a priority for our exploration team to re-start the exploration program at Parral this year to expand on the mineral resource estimate we published on the project in early 2020. Our goal is to continue the drill program at Parral in 2022 as we get closer to achieving the scale required to support a positive economic assessment."

The Parral project, which was acquired by Endeavour Silver in 2016, is in Hidalgo de Parral, a large historic silver mining district adjacent to the city of Parral, in the State of Chihuahua, Mexico. The project district comprises classic, high-grade silver, epithermal vein deposits, characterized by low-sulphidation mineralization. The property is accessible by paved and gravel roads and has access to the local power grid.

The Veta Colorada (including the Sierra Plata and El Verde mines) was a past producing mining operation owned by Grupo Mexico that closed in 1991 due to low silver prices. Mineralization, which occurs in a major silver vein structure that ranges from 1 to 30 metres thick, was mined seven levels down to 300-metre depths below surface in places and was traced for seven kilometres.

The Company filed a NI 43-101 technical report on the Parral project, State of Chihuahua, Mexico on March 14, 2020. As of December 31, 2019, Parral had estimated indicated mineral resources of 613,000 tonnes, containing 4.0 million ounces of silver grading 207 g/t, 6,800 ounces of gold grading 0.35 g/t, 17.5 million pounds of lead grading 0.63%, and 16.5 million pounds of zinc grading 0.61%. Inferred mineral resources are estimated to total 4.04 million tonnes containing 35.0 million ounces of silver grading 269 g/t, 62,800 ounces of gold grading 0.48 g/t, 65.0 million pounds of lead grading 0.35%, and 64.3 million pounds of zinc grading 0.35%.

Due to the COVID-19 pandemic, the Company suspended the Parral drill programs in early 2020 and resumed drilling in 2021.

The Parral drill results are summarized in the following tables:

Parral - Veta Colorada Sierra Plata Shallow

Hole
Structure
FromTrue WidthAuAgCuPbZnAgEq
(m)(m)(gpt)(gpt)(%)(%)(%)(gpt)
VCS-07
Veta Colorada264.252.190.012320.010.080.15241
Including265.800.72<0.0052880.020.080.08296
VCS-10
Veta Colorada219.350.890.012,8460.650.000.012,914
Including219.500.750.013,3800.770.000.013,461
VCS-12
Veta Colorada196.751.200.013400.040.320.60374
Including196.750.860.013840.040.360.65422

Note: Drill holes VCS-8, VCS-9, VCS-11, VCS 13, VCS-29, VCS-30, VCS-31 and VCS-32 returned no significant results

Parral - Veta Colorada San Joaquin (view Veta Colorada (San Joaquin) longitudinal sections)

Hole
Structure
FromTrue WidthAuAgCuPbZnAgEq
(m)(m)(gpt)(gpt)(%)(%)(%)(gpt)
VCS-18
Veta Colorada164.101.892.27920.023.351.90434
Including164.100.705.791930.010.050.14663
VCS-19
Veta Colorada173.651.301.054700.184.519.951,050
Including174.200.811.517440.245.729.151,370
VCS-20
Veta Colorada230.852.760.98590.142.722.75322
Including231.850.623.83910.276.901.81675
VCS-21
Veta Colorada186.001.470.28280.222.871.71211
Including187.400.330.75910.8410.353.06624
VCS-24
Veta Colorada254.203.951.38410.192.202.83332
Including257.250.681.691160.227.054.82635
VCS-25
Veta Colorada262.851.600.22500.143.026.53396
Including263.450.310.271050.236.3417.30939
VCS-26
Veta Colorada313.151.110.14150.022.072.19163
Including313.650.370.22380.055.635.22399
VCS-27
Veta Colorada325.651.401.43540.201.784.87411
Including326.200.592.12430.201.865.69486
VCS-28
Veta Colorada244.504.240.27290.093.083.47266
Including244.500.390.18970.247.125.42521

Note: Drill holes VCS-15, VCS-16, VCS-17, VCS-22 and VCS-23 returned no significant results

Parral - Veta Colorada Sierra Plata Deep (view Veta Colorada (Sierra Plata) longitudinal sections)

Hole
Structure
FromTrue WidthAuAgCuPbZnAgEq
(m)(m)(gpt)(gpt)(%)(%)(%)(gpt)
VCU-21
Veta Colorada66.501.410.031980.030.600.76247
Including67.200.730.042880.050.891.39370
VCU-22
Veta Colorada88.500.930.012470.050.530.97302
Including88.950.460.024360.090.821.66528
VCU-24
Veta Colorada85.152.000.012630.020.560.25290
Including85.550.390.013400.020.150.22355
VCU-25
Veta Colorada103.801.130.021760.020.220.24193
Including105.000.380.032200.020.190.35241
VCU-26Veta Colorada107.300.930.021690.010.180.10180
VCU-27
Hw Veta Colorada146.151.120.011640.000.060.20173
Including146.150.33<0.0051890.000.050.15196
VCU-28
Veta Colorada95.600.880.011960.010.220.24213
Including96.100.220.022570.010.350.30280
VCU-30
Veta Colorada172.001.810.062630.030.612.02360
Including176.100.260.324250.120.2410.20834
VCU-31
Veta Colorada160.501.130.062240.020.270.27248
Including161.450.300.053650.040.270.46397
VCU-32
Veta Colorada156.201.080.022470.030.190.32269
Including156.800.520.022940.040.220.27315
VCU-33Veta Colorada206.300.730.031660.020.390.16186
VCU-35
Veta Colorada196.001.470.032660.151.652.82429
Including196.700.440.033810.221.082.63529
VCU-47
Veta Colorada111.801.760.021580.031.330.70224
Including111.800.560.022840.083.861.84464
VCU-48
Veta Colorada161.355.770.044170.041.410.46478
Including163.650.270.134,1700.3216.551.244,702
VCU-49
Veta Colorada178.652.480.137610.150.175.37984
Including179.750.250.101,1150.290.006.941,401
VCU-50
Veta Colorada100.301.230.557080.1610.9512.381,504
Including100.300.690.911,1300.2518.9518.702,406
VCU-53
Veta Colorada85.201.170.011780.010.240.11190
Including85.200.540.012230.010.310.12237
VCU-55
Hw Veta Colorada83.451.20.021640.060.471.04221
Including83.450.30.012900.130.800.68350
Veta Colorada96.501.20.03840.020.661.25151
Including97.000.30.041460.031.292.48275
VCU-57
Veta Colorada170.901.00.021390.031.521.46237
Including172.500.30.032120.041.763.30384

Note: Drill holes VCU-23, VCU-29, VCU-34, VCU-44, VCU-45, VCU-46, VCU-51, VCU-52, VCU-54 and VCU-56 returned no significant results

Parral - Veta Colorada El Verde (view Veta Colorada (El Verde) longitudinal sections)

Hole
Structure
FromTrue WidthAuAgCuPbZnAgEq
(m)(m)(gpt)(gpt)(%)(%)(%)(gpt)
VCU-36
Hw Veta Colorada100.752.300.091820.083.172.84384
Including102.550.560.132240.094.042.15428
Veta Colorada106.903.641.522530.113.872.39575
Including111.450.260.889530.381.961.641,173
VCU-37
Hw Veta Colorada128.703.310.201980.062.542.57381
Including131.350.420.523190.0710.358.52950
Veta Colorada135.651.610.202010.020.992.58339
Including136.750.420.313460.051.476.69654
VCU-38
Hw Veta Colorada238.151.750.052040.070.781.17278
Including240.000.330.085410.200.812.16667
Veta Colorada245.252.770.118400.259.094.741,288
Including247.000.360.261,5850.5534.884.382,755
VCU-40
Veta Colorada236.553.700.253210.144.934.46648
Including238.800.460.201,0300.447.037.431,546
VCU-41
Veta Colorada198.606.380.083250.280.782.42467
Including205.500.440.137020.400.662.98878
VCU-43
Hw Veta Colorada163.651.600.162400.050.260.48281
Including163.650.520.023800.020.090.15391
Veta Colorada166.502.360.052510.030.280.48284
Including168.500.540.076060.030.450.43643

Notes:

1.  Drill holes VCU-39 and VCU-42 returned no significant results

2.  Silver equivalents are calculated using the formula:

[Au (gpt) X 80] + Ag (gpt) + [Cu (%) X 2204.6 X Cu Price / Ag Price X 31.1] + [Pb (%) X 2204.6 X Pb Price / Ag Price X 31.1] + [Zn (%) X 2204.6 X Zn Price / Ag Price X 31.1]

3.  Price assumptions used are: Cu $3.45, Pb $0.90, Zn $1.20 and Ag $23.00

4.  All widths are estimated true widths

5.  No capping has been applied but high-grade intervals have been highlighted

Qualified Person and QA/QC - Dale Mah, P.Geo., Vice President Corporate Development of Endeavour Silver, is the Qualified Person who reviewed and approved the technical information contained in this news release. A quality control sampling program of reference standards, blanks and duplicates has been instituted to monitor the integrity of all assay results. All samples are split at the local field office and shipped to SGS Labs, where they are dried, crushed, split and 250 gram pulp samples are prepared for analysis. Gold is determined by fire assay with an atomic absorption finish and silver by aqua regia digestion with ICP finish, over-limits by fire assay and gravimetric finish.

About Endeavour Silver ? Endeavour Silver is a mid-tier precious metals mining company that operates two high-grade, underground, silver-gold mines in Mexico. Endeavour is currently advancing the Terronera mine project towards a development decision, pending financing and final permits and exploring its portfolio of exploration and development projects in Mexico, Chile and the United States to facilitate its goal to become a premier senior silver producer. The Company's philosophy of corporate social integrity creates value for all stakeholders.

SOURCE Endeavour Silver Corp.

Contact Information
Trish Moran
Interim Head of Investor Relations
Tel: (416) 564-4290
Email: [email protected]
Website: www.edrsilver.com

Follow Endeavour Silver on Facebook, Twitter, Instagram and LinkedIn

Cautionary Note Regarding Forward-Looking Statements

This news release contains "forward-looking statements" within the meaning of the United States private securities litigation reform act of 1995 and "forward-looking information" within the meaning of applicable Canadian securities legislation. Such forward-looking statements and information herein include but are not limited to statements regarding future prospects of the Company's mines and projects. The Company does not intend to and does not assume any obligation to update such forward-looking statements or information, other than as required by applicable law. 

Forward-looking statements or information involve known and unknown risks, uncertainties and other factors that may cause the actual results, level of activity, production levels, performance or achievements to be materially different from those expressed or implied by such statements. Such factors include but are not limited to the ultimate impact of the COVID 19 pandemic on operations and results, changes in production and costs guidance, national and local governments, legislation, taxation, controls, regulations and political or economic developments in Canada and Mexico; financial risks due to precious metals prices, operating or technical difficulties in mineral exploration, development and mining activities; risks and hazards of mineral exploration, development and mining; the speculative nature of mineral exploration and development and risks in obtaining necessary licenses and permits,

Forward-looking statements are based on assumptions management believes to be reasonable, including but not limited to: the continued exploration and mining operations, no material adverse change in the market price of commodities, mining operations will operate and the mining products will be completed in accordance with management's expectations and achieve their stated production outcomes, and such other assumptions and factors as set out herein. Although the Company has attempted to identify important factors that could cause actual results to differ materially from those contained in forward-looking statements or information, there may be other factors that cause results to be materially different from those anticipated, described, estimated, assessed or intended. There can be no assurance that any forward-looking statements or information will prove to be accurate as actual results and future events could differ materially from those anticipated in such statements or information. Accordingly, readers should not place undue reliance on forward-looking statements or information.



These press releases may also interest you

at 18:33
(SYDNEY, April 24, 2024) - Champion Iron Limited ("Champion" or the "Company") reports production...

at 18:15
The Schall Law Firm, a national shareholder rights litigation firm, reminds investors of a class action lawsuit against Nextdoor Holdings, Inc. f/k/a Khosla Ventures Acquisition Co. II (&quot;Nextdoor&quot; or &quot;the Company&quot;) for violations...

at 18:05
Escalade, Inc. , a leading manufacturer and distributor of sporting goods and indoor/outdoor recreational equipment, today announced that it will issue first quarter 2024 results before the market opens on Thursday, April 25, 2024. A conference call...

at 17:20
Great Neck Realty Co. is marketing the intellectual property (the "Assets") of BOA Nutrition, Inc., ("Company" or "BOA"), an innovative sports nutrition and wellness company that specialized in producing oral aerosol energy supplements tailored to...

at 17:01
West Fraser Timber Co. Ltd. ("West Fraser" or the "Company") reported today the first quarter results of 2024 ("Q1-24"). All dollar amounts in this news release are expressed in U.S. dollars unless noted otherwise.  First Quarter Highlights?  Sales...

at 16:15
Modine , a diversified leader in thermal management technologies and solutions, officially marked the opening of a second facility in Sremska, Serbia, to manufacture coils for commercial and residential heat pump applications. Serbian Prime...



News published on and distributed by: