Cartier Files on SEDAR the NI 43-101 Technical Report for the Mineral Resource Estimate of the Chimo Mine Property


Highlights of the Chimo Mine property:

The resource estimate is constrained using DSO ("Deswik Stope Optimizer") with a cut-off grade of 2.0 g/t Au for the North and South Gold Corridors and 1.5 g/t Au for the Central Gold Corridor and using a price of gold of USD 1,612 US / oz.

VAL-D'OR, Quebec, May 07, 2021 (GLOBE NEWSWIRE) -- Cartier Resources Inc. (TSX-V: ECR) ("Cartier") announces that it has filed on SEDAR the technical report titled " NI 43-101 Technical Report and Mineral Resource Estimate for the Chimo Mine Project, Quebec, Canada ", bearing the date of signature of the May 6th, 2021.

The NI 43-101 compliant report, completed by InnovExplo Inc. for Cartier, presents the results of the updated mineral resource estimate for the Chimo Mine Property situated along the Larder Lake - Cadillac Fault, 45 km to east of Val-d'Or. The report is available on SEDAR and on the Company's website.

Mineralisation on the Chimo Mine Property is comprised of 27 Gold Zones hosted within 17 Gold Structures; the latter grouped within 3 Gold Corridors. The Mineral Resource Estimate to date for the property is presented in the following table (FIGURE):

Gold Corridor
Cut-off Grade
(g/t Au)

Indicated ResourcesInferred Resources
Metric
Tonnes

(t)
Grade
(g/t Au)
Troy
Ounce

(oz Au)
Metric
Tonnes

(t)
Grade
(g/t Au)
Troy
Ounce

(oz Au)
North Gold Corridor (> 2.0)1,119,0003.85139,0001,563,0003.54178,000
Central Gold Corridor (> 1.5)5,053,0003.03493,00011,728,0002.55963,000
South Gold Corridor (> 2.0)444,0003.6152,0001,949,0003.47217,000
Total6,616,0003.21684,00015,240,0002.771,358,000

The volume of rock that contains the gold-bearing zones of the property known to date, for which the resources have been estimated, has a length in the east-west orientation of 1,400 m, a width in the north-south orientation of 675 m and a height of 1,600 m (FIGURE). The resource estimate of the North Gold Corridor, consisting of 9 zones (1A, 1B, 2, 2B, 2W, 3, 3E, 4B and 4B2), of the Central Gold Corridor, consisting of 13 zones (5B, 5B2, 5B3, 5B4, 5C, 5CE, 5M, 5M2, 5M3, 5M4, 5N, 5NE and 6N1) as well as the South Gold Corridor, consisting of 5 zones (6, 6B, 6C, 6P and 6P2), is completed from the information known to date. The majority of resources are located near existing underground openings. However, Zone 6N1 is located 125 m to the southeast and the areas in the eastern sector of the property are located 450 m to the east of the existing underground infrastructure. The potential to increase the resources below and peripheral to the 27 gold zones remains open.

Additional notes on the resource estimate

  1. The gold resource estimate was carried out by Ms. Christine Beausoleil, P. Geo. and Claude Savard, P. Geo. of InnovExplo Inc., who are independent qualified persons within the meaning of NI 43-101.

  2. These mineral resources are not mineral reserves because their economic viability has not been demonstrated. The quantity and grade of Inferred Resources reported in this Mineral Resource Estimate is uncertain in nature and there can be no assurance that any or all of the Inferred Mineral Resources can be converted to Indicated Mineral Resources with further exploration drilling.

  3. The mineral resource estimate of complies with the standards and guidelines in effect of the Canadian Institute of Mining, Metallurgy and Petroleum (CIM) as well as the NI 43-101 standard for the publication of mineral resources.

  4. The requirement of a reasonable prospect of eventual economic extraction is met by having a minimum modeling width for mineralized zones, a cut-off grade based on reasonable inputs and an economic binding volume that lends itself to a potential scenario of underground extraction for undiluted in-situ resources. The constrained volume was achieved with the Deswik Stope Optimizer (" DSO ") using a minimum mining volume of 10 m in width in the longitudinal orientation of the gold zones, by 10 m in height and 2 m in thickness varying up to a maximum of 25 m x 100 m x 15 m. The optimization was carried out using the respective cut-off grade of each of the gold corridors for the indicated and inferred resources. The results of the DSO were then used for the resource estimate statement.

  5. The resource estimate is presented for potential underground scenarios at a cut-off grade of 2.0 g/t Au for the North and South Gold Corridors and 1.5 g/t Au for the Central Gold Corridor. The cut-off grade reflects the geometry and actual width of each of the gold corridors. The cut-off grade was calculated using the following main parameters:
  1. The estimate was carried out on 17 3D solids corresponding to the structures constituting the Northern Gold Corridor (structures: 1A, 1B, 2, 3 and 4B), South (structures: 6, 6B, 6C, 6P and 6P2) and Central (structures: 5B, 5B2, 5C, 5M, 5M2, 5N and 6N1) of the Chimo Mine property whose minimum actual thickness is 2.40 m and the average thickness is 7.42 m. The contents of the samples analyzed are used when they are available otherwise in the absence of analytical content, a value of zero is assigned.

  2. The density value of 2.90 g/cm3, supported by measurements, was applied to all gold structures except for structures 1A and 1B, associated to iron formation, where a density value of 3.10 g/cm3 was used.

  3. The estimate was made from a database made up, as of September 1, 2020, of 3,658 holes totaling 296,999 m drilled, 18,612 deviation measurements as well as 83,192 samples analyzed for gold and collected over a core length of 89,805 m representing 30% of the core length drilled. This database contains 2,383 blank and standard samples, inserted for QA/QC by Cartier between November 1, 2016 and September 1, 2020. This database was validated before starting the resource estimate. The estimate was carried out on 17 mineralized structures, intersected by 67,103 m of drilling, having produced 8,611 different gold intersections.

  4. High grade capping was carried out from statistical analysis data at each of the gold structures for values varying between 30 g/t Au and 120 g/t Au from the grade of the composites, also using the grade adjacent material or a value of zero when adjacent material has not been analyzed.

  5. The underground openings (open or backfilled-cemented mine sites, drifts, raises and shafts) were modeled from transverse and longitudinal sections as well as detailed historical geological and mining plans.

  6. This mineral resource estimate was performed using GEOVIA GEMS 6.8.2. Software, using rigid limits on composites. The ordinary kriging method was used to interpolate the block model composed of blocks of dimension 5.0 m x 5.0 m x 5.0 m.

  7. The mineral resource estimate presented here is classified as indicated and inferred resources. The indicated category is defined by a minimum of 3 boreholes located within a 25 m radius and the presumed category is defined by a minimum of 2 boreholes located within a 65 m radius, where there is reasonable continuity of geology and gold grades.

  8. Ounce troy is metric tons multiplied by grade (g/t) and divided by the constant of 31.10348. The number of tonnes has been rounded to the nearest thousand. Any discrepancy in the totals is due to rounding effects. The rounding complies with the recommendations of NI 43-101.

  9. InnovExplo Inc. is not aware of any problem related to the environment, permits, mining titles or related to legal, fiscal, socio-political, commercial issues or any other relevant factor not mentioned in this press release, that could have a significant impact on the mineral resource estimate.

  10. The table of the sensitivity of the cut-off grades on the resources of the North, Central, and South Gold Corridors is presented below:

Cut-off
Grade

North Gold CorridorCentral Gold CorridorSouth Gold Corridor 
Metric
Tonnes

(t)
Grade
(g/t Au)
Troy
Ounces

(oz Au)
Metric
Tonnes

(t)
Grade
(g/t Au)
Troy
Ounces

(oz Au)
Metric
Tonnes

(t)
Grade
(g/t Au)
Troy
Ounces

(oz Au)
  
INDICATED RESOURCES
1.02,291,0002.65195,0006,802,0002.57562,000843,0002.6171,000  
1.51,604,0003.23166,0005,053,0003.03493,000630,0003.0462,000  
2.01,119,0003.85139,0003,596,0003.54410,000444,0003.6152,000  
2.5785,0004.53114,0002,588,0004.07338,000293,0004.2540,000  
3.0551,0005.3394,0001,846,0004.62274,000216,0004.7833,000  
3.5410,0006.0379,0001,318,0005.22221,000156,0005.3927,000  
4.0311,0006.7968,000979,0005.80182,000117,0005.9522,000  
INFERRED RESOURCES
1,03,779,0002.29279,00018,102,0002.101,220,0004,830,0002.24348,000  
1,52,386,0002.89222,00011,728,0002.55963,0002,897,0002.90271,000  
2,01,563,0003.54178,0007,334,0003.02712,0001,949,0003.47217,000  
2,51,145,0003.98147,0004,741,0003.44525,0001,351,0003.97172,000  
3,0814,0004.47117,0002,822,0003.93356,000903,0004.57133,000  
3,5581,0004.9893,0001,713,0004.43244,000518,0005.5392,000  
4,0432,0005.4175,000956,0005.03155,000335,0006.5370,000  

The above table illustrates the sensitivity of this mineral resource estimate to different cut-off grades for underground operation scenarios with reasonable prospects for economic extraction. The reader is cautioned that the figures provided in this table should not be construed as a statement of mineral resources. The quantities and estimated grades reported at different cut-off grades are presented for the sole purpose of demonstrating the sensitivity of the resource model to the choice of a specific cut-off grade per gold corridor.

About Chimo Mine Project

About Cartier

Cartier Resources Inc., founded in 2006, is based in Val-d'Or, Quebec. This province has consistently ranked as one of the world's best mining jurisdictions, primarily because of its favourable geology, attractive fiscal environment and pro-mining government.

Quality Assurance / Quality Control

The analytical results, from Cartier drill holes, were obtained from NQ-caliber core samples crushed up to 80% passing a 10 mesh (2.00 mm) mesh then pulverized up to 90% passing a mesh of 200 mesh (0.07mm). Cartier inserts 5% of the number of samples as certified standards and another 5% as sterile samples to ensure quality control. Samples are analyzed at Techni-Lab (Actlabs), located in Ste-Germaine-Boulé, Quebec. The 50 g pulps are analyzed by fire assay and read by atomic absorption. If i) the result is ? 1.0 g/t and <10.0 g/t, a second pulp is analyzed and read by atomic absorption and if ii) the result ? 10.0 g/t, the second measurement is performed by gravimetry. For samples containing visible gold, 500 g of rock pulverized up to 90% passing a 140 mesh (0.11 mm) mesh is analyzed by the " Metallic Sieve " method.

Qualified Persons

The scientific and technical information on the Company and the Chimo Mine Project in this news release was prepared and reviewed by Mr. Gaétan Lavallière, P. Geo., Ph. D, Cartier's Vice - President, and Mr. Ronan Déroff, P. Geo, M. Sc., Cartier's Senior Geologist, Project Manager and Geomatician, both qualified persons as defined in NI 43-101. Mr. Lavallière approved the information contained in this press release.

The qualified persons independent of the issuer within the meaning of NI 43-101, responsible for estimating the mineral resources of the Chimo Mine Property, is Ms. Christine Beausoleil, P. Geo., and Claude Savard, P. Geo., of InnovExplo Inc. Ms. Beausoleil and Savard declare that she read this press release and that the scientific and technical information relating to the resource estimate presented therein is consistent.

About InnovExplo Inc.

InnovExplo Inc. is a consulting firm providing services in mineral exploration, mining geology, mineral resources, mining engineering, the environment, and sustainable development. Since its founding in 2003, InnovExplo Inc. has worked on 450 different mandates for 170 junior mineral exploration companies and producers. The firm has produced more than 300 geological or engineering reports for projects covering almost all areas of a mining project, from exploration to operations, mainly including the drafting of NI 43-101 technical reports.

For more information, contact:

Philippe Cloutier, P. Geo.
President and CEO
Telephone: 819-856-0512
[email protected]
www.ressourcescartier.com

Neither the TSX Venture Exchange nor its regulatory services provider accepts responsibility for the adequacy or accuracy of this press release. 



These press releases may also interest you

at 17:15
NOVAGOLD's Annual General Meeting of Shareholders (the "Meeting") will be held virtually on May 16, 2024 at 1:00 p.m. PSTShareholders may vote on matters before the Meeting by proxy, join the virtual Meeting and vote, and submit questions either...

at 17:10
Gatos Silver, Inc. ("Gatos Silver" or the "Company") today provided an update on the drilling and exploration programs in the Los Gatos district ("LGD") in Mexico. The update includes new intercepts of mineralization in the South-East Deeps ("SE...

at 17:05
Eldorado Gold Corporation ("Eldorado", "Eldorado Gold" or "the Company") today reports the Company's financial and operational results for the first quarter of 2024. For further information please see the Company's Consolidated Financial Statements...

at 17:05
Euromax Resources Ltd. : ("Euromax" or the "Company"), announces today that the Ontario Securities Commission (the "OSC") has granted a partial revocation revocation dated April 25, 2024 (the "Partial Revocation") of a cease trade order (the "CTO")...

at 17:00
(BSE: LUC) Please view PDF version Lucara Diamond Corp. ("Lucara" or the "Company") announces that it will be publishing its First Quarter 2024 Results on Thursday, May 9, 2024 after market close in North America.  The Company will host a...

at 17:00
Agnico Eagle Mines Limited  ("Agnico Eagle" or the "Company") today reported financial and operating results for the first quarter of 2024. "Building on a very strong close to 2023, we are reporting our second consecutive quarter of record...



News published on and distributed by: