Le Lézard
Classified in: Mining industry
Subject: MISCELLANEOUS

Bullfrog Gold Receives Assays on 5 More Holes at Its Project in the Bullfrog Mining District of Nevada, Including 14 Meters of 2.42 g gold/t and 46 Meters of 0.30 g/t


GRAND JUNCTION, Colo., July 07, 2020 (GLOBE NEWSWIRE) -- via NetworkWire ? Bullfrog Gold Corp. (BFGC:OTCQB; BFG:CSE; 11B:FSE) ("Bullfrog," "BFGC" or the "Company") today announced assay results from five more of the 25 holes recently drilled at its Bullfrog Project ("Project"). The Project comprises 2,125 hectares (5,250 acres) of strategic lands, established resources and prospective exploration potential in the Bullfrog Mining District located 4 miles west of Beatty, Nevada (200 km northwest of Las Vegas, Nevada). The Bullfrog and surrounding area are in one of the most prolific gold exploration regions in North America that includes significant activities by neighboring AngloGold, Kinross Gold, Coeur Mining and Corvus Gold. The Company has commanding land and resource positions in the Bullfrog mine area and obtained Barrick Bullfrog Inc.'s large data base, including detailed information on 250,000 meters (155 miles) of drilling in the area.    

Key Points

MH Drill Hole Assay Data
Table 1 shows the assay and drill data on five additional MH holes, all of which contained significant mineral intercepts. The high-grade intercept in BH-20-10 is in the Bullfrog brecciated vein whereas all the lower grade intercepts are in the MH mineralized fault zone. This interval is consistent in grade and confirms continuity along the strike and dip of similar mineralized intervals in surrounding old drill holes.  

Table 1
Mystery Hill Drill and Assay Data
 
Hole MH Intervals, Feet 2  MH Intervals, Meters 3 Gold 1Silver Total
 No. FromToLength FromToLengthg/tg/t Depth, Ft
            
BH-20-1013518045 4155142.4162.19 660
includes13515520 414764.8924.14  
            
 34036020 10411060.5760.26  
            
BH-20-119013040 2740120.2970.20 660
 16018525 495680.3080.08  
 22030080 6791240.3540.18  
 42045535 128139110.2010.34  
            
BH-20-1210517065 3252200.3530.33 460
 26030040 7991120.4540.18  
            
BH-20-1307070 021210.2440.28 560
 12516540 3850120.4350.34  
 310460150 95140460.3040.20  
            
BH-20-18153520 51160.2310.21 350
 13022595 4069290.2220.16  
 24531570 7596210.2370.00  
Tot./ Wtd. Avg 795   2420.4260.32  
 
1 Nominal gold cut off: 0.20 g/t. Could be lower with current gold prices and higher leach recovery.
Minimum 20 feet waste between mineral intervals. Maximum 20 feet waste within mineral intervals.
2 As spatial data is not currently available, mineral interval lengths are not true thicknesses.
3 Rounded - Decimals not shown 

The use of high pressure grinding rolls (HPGR) to produce column leach feeds having more micro-fractures in a minus 1/16-inch size achieved an average recovery of 85.8% from four bulk samples compared to 70.7% from a conventionally crushed size of minus 3/8-inch. These representative bulk samples were collected near the bottom of the Bullfrog and Montgomery-Shoshone (MS) pits and a dump from a 140-foot deep shaft in the MH area. The MH sample contained 0.34 g/t, yet recoveries were 91% at the very fine size compared to 83% from the conventional crushed size of 3/8-inch size. The Bullfrog area mineralization is highly amenable to using HPGRs rolls and leaching at very fine sizes, but additional sampling and testing are planned to provide greater certainty of gold and silver recoveries and further support future Project studies.   

Most of the Company's resources are on lands in the Barrick lease/option and located within the dashed green line on Figure 1 and northern part of the pit. The north Bullfrog resources have been adequately drilled in all dimensions necessary to optimize and design a final pit plan, but a few more holes may be cored to provide samples for column leach testing. The MH now appears to have enough definition drilling, but core from one or two more holes may also be collected for column leach testing. Figure 1 also shows the location of the cross section through the north Bullfrog pit and the Mystery Hill area. Figure 2 is the cross section that shows the high grade Bullfrog vein in a gold color and the mineralization in the MH fault that outcrops, dips to the west and connects to the Bullfrog fault at depth.                                

Drill Holes, Pit Expansions and Cross Section Locations
Figure 1:
 https://www.globenewswire.com/NewsRoom/AttachmentNg/27b3ba7e-5e4d-48ac-bcd3-5921ce130f76

Cross Section through North Bullfrog Pit & Mystery Hill Area
Figure 2: https://www.globenewswire.com/NewsRoom/AttachmentNg/c54c2bef-f44f-40f8-b654-52ce9bccd509

Montgomery-Shoshone and Paradise Ridge Exploration Target
Assays from the three remaining holes drilled in the west side of the MS area and two holes drilled in the south zone of the Paradise Ridge target are expected to be released before mid-July 2020.

About Bullfrog Gold Corp. and Current Resources
Bullfrog Gold Corp. is a Delaware corporation that controls the commanding land and mineral positions in the Bullfrog Mine area where Barrick produced 2.3 million ounces of gold by mining and conventional milling beginning in 1989 and ending in 1999 when ore reserves were depleted.   Measured and indicated (M&I) 43-101 compliant resources were estimated in mid-2017 by Tetra Tech Inc. at 525,000 ounces of gold, averaging 1.02 gold g/t in base case plans of the MS and Bullfrog pits, the latter of which included minor MH resources. Most of these resources are in the north extension to the Bullfrog pit. Inferred resources were estimated at 110,000 ounces of gold averaging 1.2 g/t. Based on the wide-spaced drill holes, most of the MH resources are also in the inferred classification. It is noted that the 3-year trailing average gold price is now $170 higher than the $1,200 average price used in 2017. The resource estimates were also based on a heap leach gold recovery of 72% compared to the average 85% leach test recoveries recently achieved on four bulk samples.  

Quality Control/Quality Assurance
The drill program was designed by David Beling, CEO and P.E., and managed by Clive Bailey, CPG and Lead Consultant responsible for all aspects of field activities, geological services and quality assurance and control requirements. On-site personnel log and track all samples prior to sealing and shipping. Quality control is monitored by the insertion of blind, certified standard reference materials, duplicate splits, and blanks into each sample shipment. All samples are shipped to American Assay Laboratories (AAL) in Reno, Nevada, for preparation and assaying. AAL is independent of the Company, and its quality system complies with the requirements for the International Standards ISO 9001:2000 and ISO 17025:1999. Analytical accuracy and precision are monitored by the analysis of reagent blanks, reference material and duplicate samples. Upon receipt of all assays, additional field samples and pulps may be assayed by other labs to further validate and verify results. Mr. Beling has verified the data underlying the information disclosed herein, including sampling, analytical and test data, and reviewing the reports of AAL, methodologies, results and all procedures undertaken for quality assurance and quality control in a manner consistent with industry practice.

Qualified Person
David Beling, P.E., has 55 years of project and corporate experience in the mining industry and is a qualified person as defined by Canadian National Instrument 43-101 ? Standards of Disclosure or Mineral Projects. Mr. Beling has prepared, supervised the preparation of, or approved the technical information that forms the basis of the Company's disclosures but is not independent of Bullfrog Gold Corp. For further information, please contact David Beling, CEO & President, at (970) 628-1670.

Cautionary Note Regarding Forward Looking Statements
This press release contains certain "Forward-Looking Statements" within the meaning of Section 27A of the Securities Act of 1933, as amended, and Section 21E of the United States Securities Exchange Act of 1934, as amended. All statements, other than statements of historical fact, included herein including those with respect to the objectives, plans and strategies of the Company and those preceded by or that include the words "believes," "expects," "given," "targets," "intends," "anticipates," "plans," "projects," "forecasts" or similar expressions, are forward-looking statements  that involve various risks and uncertainties.

Such forward-looking information and statements are based on numerous assumptions, including among others, the Company's ability to successfully maintain its listings, the stability of industry and market costs and trends and the Company's ability to obtain all regulatory approvals required for its planned objectives. Furthermore, by their very nature, forward-looking information involves a variety of known and unknown risks, uncertainties and other factors which may cause the actual plans, intentions, events, results, performance, or achievements of the Company to be materially different from those expressed or implied by such forward-looking information. Such risks, uncertainties and other factors include, without limitation, those related to: (a) adverse regulatory or legislative changes (b) market conditions, volatility and global economic conditions (c) industry-wide risks (d) the Company's inability to maintain or improve its competitive position and (e) the ability to obtain financing needed to fund the continued development of the Company's business. The Company is presently an exploration stage company.  Exploration is highly speculative in nature, involves many risks, requires substantial expenditures, and may not result in the discovery of mineral deposits that can be mined profitably.  Furthermore, the Company currently has no reserves on any of its properties.  As a result, there can be no assurance that such forward-looking statements will prove to be accurate, and actual results and future events could differ materially from those anticipated in such statements.  Additional information regarding important factors that could cause actual results to differ materially from the Company's expectations is disclosed in the Company's documents filed with the United States Securities & Exchange Commission or on www.sedar.com.  Investors are urged to consider closely the disclosures in our Form 10-K and other SEC filings, which can be obtained from the SEC's website at http:www.sec.gov/edgar.shtml. Additional technical and corporate information may also be sourced at www.bullfroggold.com.

Corporate Communications:
InvestorBrandNetwork (IBN)
Los Angeles, California
www.InvestorBrandNetwork.com
310.299.1717 Office
[email protected] 


These press releases may also interest you

at 08:32
XCMG Machinery (SHE:000425, "XCMG") is proud to announce its recent triumph at the 2024 German Design Awards, where it has been awarded the Excellent Communications Design in Integrated Campaigns and Advertising for its innovative "Cultural Gift"...

at 08:30
Asahi Kasei Plastics North America Inc (APNA), manufacturer of Asaclean and a leading supplier of purging compounds for the plastics industry, has announced a new partnership with renowned plastics distributor, Polysource. This exclusive distribution...

at 07:29
In a strategic move to address the growing talent shortage in the global construction equipment industry, XCMG Machinery (SHE:000425, "XCMG") has launched an extensive cross-training program for its employees from XCMG Global Business Headquarters....

at 06:30
The Actuators market is estimated at USD 67.7 billion in 2024 and is projected to reach USD 94.8 billion by 2029, at a CAGR of 7.0 % from 2024 to 2029 according to a new report by MarketsandMarketstm. The growth can be attributed to growing...

28 mar 2024
Discovery Silver Corp. ("Discovery" or the "Company") today announced financial results for the three and twelve months ended December 31, 2023 ("Q4 2023" and "2023", respectively). The Company also provided a summary of key events since the...

28 mar 2024
Osisko Development Corp. ("Osisko Development" or the "Company") reports its financial and operating results for the three and twelve months ended December 31, 2023 ("Q4 2023"). Q4 2023 HIGHLIGHTS Operating, Financial and Corporate Updates: 2,090...



News published on and distributed by: