Le Lézard
Classified in: Mining industry, Business
Subject: MINING EXPLORATION UPDATE

Ascot Resources Intersects 30.65 g/t Gold Over 6.05 Meters at Premier


VANCOUVER, BRITISH COLUMBIA--(Marketwired - May 25, 2017) - Ascot Resources Ltd. (TSX VENTURE:AOT)

The Premier property covers more than one hundred square kilometres near the town of Stewart in northwest BC, and includes the old Premier Mine, a past producer of 2.1 MOz Au and 44.9 MOz Ag.

Highlights of Release:

? New drill highlights include:

Hole # Zone   From
m's
To
m's
Width
m's
Au
(g/t)
Au Cut*
(g/t)
Ag
(g/t)
Zn
%
                   
P17-1227 NL West   240.50 263.50 23.00 1.80 1.80 14.5 1.03
    incl. 251.00 261.00 10.00 4.05 4.05 31.0 2.14
    incl. 254.81 257.50 2.69 6.78 6.78 22.8 2.55
                   
P17-1231 602   314.23 344.00 29.77 1.10 1.10 14.4 0.97
    incl. 326.00 336.50 10.50 2.02 2.02 42.8 2.51
    incl. 335.00 336.50 1.50 5.37 5.37 8.3 0.50
                   
P17-1232 602 also 280.00 342.90 62.90 1.50 1.50 6.0 0.33
    incl. 318.00 328.00 10.00 5.18 5.18 11.0 0.99
    incl. 318.00 319.00 1.00 26.50 26.50 18.0 1.24
                   
P17-1241 NL Main   266.00 339.00 73.00 1.51 1.51 4.4 0.19
    incl. 285.00 312.00 27.00 2.87 2.87 6.2 0.31
    incl. 289.00 296.50 7.50 5.16 5.16 8.8 0.54
    incl. 289.00 290.00 1.00 17.55 17.55 31.6 2.38
    incl. 295.50 296.50 1.00 11.75 11.75 20.6 1.39
                   
P17-1242 NL Main   256.48 339.33 82.85 2.23 1.79* 6.6 0.25
    incl. 265.00 306.00 41.00 3.92 3.04* 10.7 0.41
    incl. 293.87 306.00 12.13 10.40 7.44* 24.8 1.17
    incl. 293.87 295.95 2.08 40.87 23.58* 126.5 5.90
    incl. 293.87 295.00 1.13 66.10 34.29* 193.0 7.41
                   
P17-1243 NL Main   252.00 333.30 81.30 0.89 0.89 3.9 0.17
    incl. 279.00 296.00 17.00 2.95 2.95 8.3 0.43
    incl. 286.50 296.00 9.50 4.76 4.76 11.7 0.61
    incl. 292.65 296.00 3.35 11.27 11.27 20.6 1.19
    incl. 292.65 294.00 1.35 21.30 21.30 40.7 2.35
                   
P17-1244 NL Main   225.00 250.50 25.50 1.14 1.14 3.3 0.14
    incl. 227.00 231.00 4.00 5.43 5.43 5.8 0.17
    also 263.00 337.79 74.79 1.04 1.04 3.8 0.21
    incl. 280.71 302.00 21.29 2.28 2.28 5.8 0.34
    incl. 282.00 284.00 2.00 11.25 11.25 4.7 0.25
                   
P17-1245 NL Main   233.50 342.90 109.40 0.70 0.70 3.3 0.27
    incl. 273.71 314.00 40.29 1.10 1.10 3.7 0.28
    incl. 305.34 314.00 8.66 2.26 2.26 4.4 0.33
    incl. 310.00 311.00 1.00 5.92 5.92 8.4 0.52
                   
P17-1248 NL Main   238.58 328.64 90.06 0.60 0.60 3.1 0.26
    incl. 280.00 308.50 28.50 1.37 1.37 5.8 0.54
    incl. 280.00 286.50 6.50 3.66 3.66 14.2 1.43
    incl. 281.00 283.00 2.00 5.10 5.10 14.4 1.35
    incl. 284.00 285.00 1.00 6.03 6.03 8.2 1.21
                   
P17-1249 NL Main   259.75 323.36 63.61 1.24 1.24 4.3 0.27
    incl. 259.75 267.00 7.25 7.22 7.22 5.2 0.24
    incl. 259.75 262.00 2.25 20.80 20.80 5.0 0.11
                   
P17-1251 NL Main   259.05 304.40 45.35 1.28 1.28 8.2 0.33
    incl. 272.00 279.00 7.00 5.35 5.35 21.5 0.97
    incl. 272.00 275.50 3.50 8.99 8.99 27.2 1.21
    incl. 274.50 275.50 1.00 11.65 11.65 22.6 2.13
                   
P17-1259 NL Main   235.50 321.56 86.06 0.99 0.99 4.3 0.19
    incl. 244.00 248.00 4.00 9.10 9.10 10.0 0.30
    incl. 244.00 246.00 2.00 12.65 12.65 11.5 0.38
    incl. 289.00 317.00 28.00 1.28 1.28 6.6 0.25
    incl. 289.00 292.00 3.00 6.43 6.43 27.9 0.53
    incl. 291.00 292.00 1.00 12.45 12.45 30.9 0.71
                   
P17-1263 NL West   188.90 214.00 25.10 1.34 1.34 17.9 2.30
    incl. 195.90 207.60 11.70 2.40 2.40 34.6 4.66
    incl. 201.30 204.30 3.00 5.51 5.51 104.6 12.83
    incl. 201.30 202.30 1.00 11.20 11.20 100.0 12.60
                   
P17-1265 NL Main   289.50 337.41 47.91 1.50 1.50 3.9 0.16
    incl. 302.50 325.00 22.50 2.28 2.28 3.5 0.15
    incl. 307.00 308.50 1.50 5.49 5.49 2.9 0.12
    incl. 313.00 314.47 1.47 5.50 5.50 5.9 0.08
    incl. 320.50 322.00 1.50 8.22 8.22 3.2 0.21
                   
P17-1266 NL Main   274.00 338.64 64.64 1.17 1.17 3.7 0.18
    incl. 282.46 303.24 20.78 2.43 2.43 4.9 0.20
    incl. 282.46 287.00 4.54 7.60 7.60 13.6 0.58
    incl. 282.46 284.00 1.54 14.45 14.45 12.1 0.71
                   
P17-1267 NL Main   274.00 359.97 85.97 1.13 0.96* 4.8 0.14
    incl. 294.00 343.00 49.50 1.75 1.46* 4.4 0.13
    incl. 294.00 301.50 7.50 9.00 7.10* 14.0 0.40
    incl. 300.50 301.50 1.00 48.60 34.29* 22.3 0.84
                   
P17-1273 602   348.10 358.00 9.90 18.89 15.22* 22.8 1.01
    incl. 348.10 354.15 6.05 30.65 24.65* 35.5 1.61
    incl. 349.61 352.65 3.04 46.23 34.29* 42.6 2.00

True widths are believed to be 70-90% of intersected widths in the Premier area. (*) samples cut to 1opt or 34.29 g/t Au.

This release is the first results for the 2017 season reporting 44 holes P17-1225-1267 and P17-1273 (P17-1268-1272 still pending). Drilling has steadily scaled up and at present, six Ascot owned drill rigs are operating on the property. To date 81 holes have been completed in 25,019 meters of drilling. 37 drill holes are presently pending results and results will be released as they become available. Detailed results table, locations and figures can be viewed at the following Ascot link: www.ascotgold.com

Graeme Evans, P. Geo and Lawrence Tsang, P. Geo provide the field management for the Premier exploration program. Graeme Evans, designated as the Qualified Person (QP) as defined by National Instrument 43-101 has prepared the technical information in this news release.

Quality Assurance/Quality Control

Analytical work is being carried out by ALS Lab Group. Quality assurance and quality control programs include the use of analytical blanks and standards and duplicates in addition to the labs own internal quality assurance program. All samples were analyzed using multi-digestion with ICP finish and fire assay with AA finish for gold. Samples over 100 ppm silver were reanalyzed using four acid digestion with an ore grade AA finish. Samples over 1,500 ppm silver were fire assayed with a gravimetric finish. Samples with over 10 ppm gold were fire assayed with a gravimetric finish. Identified or suspected metallic gold or silver are subjected to "metallics" assays. Also for extreme high gold grades a concentrate analysis is performed with a fire assay and gravimetric finish accurate up to 999985 ppm Au limit (ALS Au-CON01) method. Sampling and storage are at the company's secure facility in Stewart with bi-weekly sample shipments made to ALS Labs Terrace prep site.

On Behalf of the Board of Directors

ASCOT RESOURCES LTD.

John A. Toffan, President and Director

Neither the TSX Venture Exchange nor its Regulation Service Provider (as the term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy of this release.

Cautionary Statement Regarding Forward-Looking Information

All statements, trend analysis and other information contained in this press release relative to markets about anticipated future events or results constitute forward-looking statements. Forward-looking statements are often, but not always, identified by the use of words such as "seek", "anticipate", "believe", "plan", "estimate", "expect" and "intend" and statements that an event or result "may", "will", "should", "could" or "might" occur or be achieved and other similar expressions. All statements, other than statements of historical fact, included herein, including, without limitation; statements regarding the exploration and mineralization potential of the Premier property, are forward-looking statements. Forward-looking statements are subject to business and economic risks and uncertainties and other factors that could cause actual results of operations to differ materially from those contained in the forward-looking statements. Important factors that could cause actual results to differ materially from Ascot's expectations include fluctuations in commodity prices and currency exchange rates; uncertainties relating to interpretation of drill results and the geology, continuity and grade of mineral deposits; the need for cooperation of government agencies and native groups in the exploration and development of properties and the issuance of required permits; the need to obtain additional financing to develop properties and uncertainty as to the availability and terms of future financing; the possibility of delay in exploration or development programs and uncertainty of meeting anticipated program milestones; and uncertainty as to timely availability of permits and other governmental approvals. Forward-looking statements are based on estimates and opinions of management at the date the statements are made. Ascot does not undertake any obligation to update forward-looking statements except as required by applicable securities laws. Investors should not place undue reliance on forward-looking statements.


These press releases may also interest you

at 03:00
The report Steel Fiber Market  by Type (Hooked, Straight, Deformed, Crimped), Manufacturing Process (Cold Drawn, Cut Wire, Melt Extract, Slit Sheet), Application (Concrete Reinforcements, Composite Reinforcements, Refractories), & Region- Global...

at 02:39
MYTILINEOS Energy & Metals (RIC: MYTr.AT) (Bloomberg: MYTIL.GA) announces its Q1 2024 financial results. 10% increase in Net Profit after minorities to ?158 million vs. ?143 million in Q1 2023. Earnings per Share came in at ?1.141, an increase of...

at 02:26
Having consistently outperformed its targets and strategic goals, MYTILINEOS Energy & Metals ("MYTILINEOS") has initiated a review and evaluation of its strategic options, in consultation with its financial, legal and tax...

at 02:00
Galantas Gold Corporation (the ?Company') is pleased to announce its audited annual financial results for the year ended December 31, 2023. A copy of the Financial Statements and Management Discussion and Analysis will be sent to shareholders in due...

at 01:05
Teck Resources Limited (Teck) today announced its unaudited first quarter results for 2024. "All outstanding major construction at our QB operation was completed in the first quarter, including the shiploader and molybdenum plant, and we marked the...

24 avr 2024
KMM Group, Ltd., a leader in ultra-precision machining and grinding, successfully hosted a ribbon-cutting ceremony and grand opening of its new global headquarters on April 24, 2024. The event marked a significant expansion into a newly renovated,...



News published on and distributed by: