Le Lézard
Classified in: Mining industry, Business
Subject: MINING EXPLORATION UPDATE

Perseus Mining Limited Updates Life of Mine Plan for Edikan Gold Mine


PERTH, WESTERN AUSTRALIA--(Marketwired - Feb. 21, 2017) -

NOT FOR DISTRIBUTION TO UNITED STATES NEWSWIRE SERVICES OR FOR DISSEMINATION IN THE UNITED STATES

Perseus Mining Limited (ASX:PRU)(TSX:PRU) is pleased to announce details of its updated Life of Mine Plan ("LOMP") for its Edikan Gold Mine in Ghana, West Africa ("Edikan").

HIGHLIGHTS

UPDATED LIFE OF MINE PLAN FOR EDIKAN GOLD MINE

  1. Overview

The updated LOMP for Edikan involves mining and processing of ore from six open pits (Refer to Figure 1 below) based on optimisation, design and scheduling using a gold price of US$1,200 per ounce and input parameters based on Perseus's operating experience including costs from recently contracted supply contracts. 

To view Figure 1: Edikan Gold Mine layout, visit the following link: http://media3.marketwire.com/docs/Perseus-figure1.pdf.

Based on the LOMP, the key forecast operating statistics for Edikan are summarised below in Tables 1 below.

Table 1: Overview Key Parameters of the updated LOMP
Parameter Units Average per year Total
Ex-Pit Mining   FY18-221 Life of Mine
Total ore + waste mined Mt 34.7 156.1
Waste mined Mt 25.4 114.5
Ore mined Mt 9.2 41.62
Head grade g/t gold 1.13 1.13
Strip ratio t:t 2.8 2.8
Note: 1. Perseus has a financial year that ends on June 30.
  2. The LOMP excludes the Esuajah South Ore Reserve, but all other Ore Reserves are included consistent with Table 5 in Section 3 of this document.
 
Table 1: Overview Key Parameters of the updated LOMP (Continued)
Parameter Units Average per year Total
Processing   FY18-221 Life of Mine
Quantity ore processed Mt 7.3 47.62
Head grade processed g/t gold 1.19 1.06
Contained gold '000 ounces 281 1,624
Gold recovery rate % 88.3 88.1
Mine Call Factor3 % 3.0 3.0
Gold production '000 ounces 240 1,388
Operating and Capital Costs      
Average mining costs US$/tonne mined 3.24 3.29
Average processing costs US$/tonne processed 9.14 9.21
Average general & administration ("G&A") costs US$/tonne processed 2.37 2.16
Production costs US$/ounce 769 758
Royalty US$/ounce 81 81
Sustaining capital US$/ounce 25 25
All-in site costs US$/ounce 875 864
Note: 1. Perseus has a financial year that ends on June 30.
  2. Includes Ore mined ex-pit plus Ore drawn from ROM stockpile and Heap Leach pads.
  3. The Mine Call Factor is an allowance to cover any residual mine to mill reconciliation issues that may exist after the full implementation of improvement measures that among other things, have included the new Mineral Resource estimates.
  1. Comparison of Key Parameters relative to the April 2016 EDIKAN LOMP

The current LOMP differs relative to the prior version of the LOMP released in April 2016, as shown below in Table 2.

Table 2: Overview Key Parameters of the updated LOMP
Parameter Units 2016 LOMP1 2017 LOMP2 % Change
Mining        
Total ore + waste mined Mt 149.5 156.1 +4
Waste mined Mt 109.3 114.5 +5
Ore mined Mt 40.2 41.6 +4
Head grade g/t gold 1.15 1.13 -2
Strip ratio t:t 2.7 2.8 +4
Processing        
Average quantity ore processed Mt/year 7.2 7.3 +1
Head grade processed g/t gold 1.08 1.06 -2
Contained gold '000 ounces 1,624 1,624 0
Gold recovery rate % 88.5 88.1 -1
Mine Call Factor % - 3.0 NA
Gold production '000 ounces 1,437 1,388 -3
Average gold production '000 ounces/ year 221 214 -3
Operating and Capital Costs        
Average mining costs US$/tonne mined 3.47 3.29 -5
Average processing costs US$/tonne processed 8.73 9.21 +5
Average Site G&A costs US$/tonne processed 2.19 2.16 -1
Production costs US$/ounce 714 758 +6
Royalty US$/ounce 81 81 0
Sustaining capital US$/ounce 16 25 +56
All-in site costs US$/ounce 811 864 +7
Notes: 1. FY2017 omitted from 2016 LOMP for comparison purposes
  2. LOMP commences July 1, 2017 and ends December 31, 2023
  1. Mineral Resources and Ore Reserves

The updated global Measured and Indicated Mineral Resource for Edikan is now estimated as 155.8 Mt grading at 1.0g/t gold, containing 5,011 kozs of gold as shown in Table 3. The Mineral Resource includes the Esuajah South Underground Resource, which is not included in the current LOMP.

Table 3: Edikan's Measured and Indicated Mineral Resources - December 2016
Deposit Deposit Type Measured Resources Indicated Resources Measured + Indicated
Resources
Quantity Grade Gold Quantity Grade Gold Quantity Grade Gold
Mt g/t gold koz Mt g/t gold koz Mt g/t gold koz
AF Gap1, 2 Open Pit 11.0 0.97 342 35.6 0.84 963 46.6 0.87 1,305
Fobinso1, 2 Open Pit 2.7 1.08 93 11.8 0.94 357 14.5 0.97 450
Esuajah North1, 2 Open Pit 11.4 0.96 352 19.5 0.89 557 30.9 0.92 909
Fetish1, 2,5 Open Pit 9.6 1.00 309 23.9 0.90 692 33.5 0.93 1,001
Chirawewa North1, 2 Open Pit 1.4 0.85 38 5.7 0.82 150 7.1 0.83 188
Chirawewa South1, 2 Open Pit 0.2 1.16 6 0.6 1.02 19 0.8 1.05 25
Bokitsi South1, 2 Open Pit 0.9 2.57 71 1.1 1.90 66 1.9 2.20 137
Sub-Total Open Pit 37.2 1.01 1,211 98.2 0.89 2,804 135.3 0.92 4,015
Esuajah South3 U/ground 8.5 1.9 533 6.3 1.7 353 14.8 1.8 879
Heap Leach4 Stockpile       4.3 0.6 89 4.3 0.6 89
ROM Stockpiles Stockpile 1.4 0.61 28 - - - 1.4 0.61 28
Total   47.1 1.17 1,772 108.8 0.93 3,246 155.8 1.00 5,011

A further 30.0 Mt of material grading at 0.9 g/t gold and containing a further 899 kozs of gold are classified as Inferred Resources. Details of these estimates are shown below in Table 4.

Table 4: Edikan's Inferred Mineral Resources - December 2016
Deposit Deposit Type Inferred Resources
Quantity Grade Gold
Mt g/t gold koz
AF Gap1, 2 Open Pit 9.4 0.8 250
Fobinso1, 2 Open Pit 3.5 0.9 95
Esuajah North1, 2 Open Pit 2.9 0.9 88
Fetish1, 2,5 Open Pit 6.3 1.0 191
Chirawewa North1, 2 Open Pit 1.5 0.8 39
Chirawewa South1, 2 Open Pit 0.04 1.1 1
Bokitsi South1, 2 Open Pit 1.3 1.1 43
Esuajah South3 Underground 4.7 1.3 192
Total   30 0.9 899

Notes on Tables 3 and 4: 

  1. Allows for mining depletion to December 31, 2016.
  2. 0.4g/t gold cut-off applied
  3. 0.7g/t gold cut-off grade applied
  4. At zero cut-off grade
  5. Includes Bokitsi North lode
  6. Mineral Resources are inclusive of any Ore Reserves
  7. Numbers are rounded and may not add up correctly in the table
  8. Note that the Dadieso and Mampong deposits have been removed from the Mineral Resource on economic grounds

Edikan's updated Ore Reserve which is summarised below in Table 5 is estimated at 56.5 million tonnes of ore, grading 1.14 g/t gold and containing 2,078kozs of gold and is based on the re-estimated Edikan Mineral Resources as at 31 December 2016 and updated pit optimisation, design and scheduling of the Open Pit resources and a new Esuajah South Ore Reserve based on underground mining methods. Table 5 reports the Ore Reserves by category, deposit and type, above variable cut-off grades. The classification categories of Proved and Probable under the JORC Code are equivalent to the CIM categories of the same name (CIM, 2010).

Table 5: Edikan's Proved and Probable Ore Reserves as at December 31, 2016
Deposit Deposit Type Proved Probable Proved + Probable
Quantity Grade Gold Quantity Grade Gold Quantity Grade Gold
Mt g/t gold koz Mt g/t gold koz Mt g/t gold koz
AF Gap Open Pit 5.5 1.09 191 6.0 1.07 208 11.5 1.08 399
Fobinso Open Pit 1.1 1.19 44 3.3 1.11 119 4.5 1.13 163
Esuajah North Open Pit 6.5 1.10 229 7.8 1.04 262 14.3 1.07 491
Fetish Open Pit 4.6 1.21 179 7.9 1.11 281 12.5 1.15 459
Chirawewa North Open Pit 0.5 1.05 17 2.0 0.99 63 2.5 1.01 80
Bokitsi Open Pit 0.5 2.94 44 0.1 2.75 10 0.6 2.91 55
Sub-total Open Pit 18.7 1.17 704 27.1 1.08 943 45.8 1.12 1,647
Esuajah South U/ground       4.9 2.0 314 4.9 2 314
Heap Leach Stockpile       4.3 0.6 89 4.3 0.6 89
ROM Stockpiles Stockpile 1.4 0.61 28       1.4 0.61 28
Total   20.1 1.13 733 36.3 1.13 1,346 56.5 1.14 2,078

Notes:

  1. Numbers are rounded and may not add up correctly in the table
  2. All the estimates are on a dry tonne basis
  3. Based on December 2016 Mineral Resource estimation
  4. Variable gold cut-off grade based on material type and mining method
  5. Inferred Mineral Resource is treated as mineralised waste
  6. Allows for mining depletion up to and including December 31, 2016
  7. ROM denotes Run of Mine
  8. Heap Leach refers to decommissioned heap leach pads established by prior owners of Edikan

Proven and Probable Ore Reserves are found within the economic limits of six discrete open pits, an underground project (not currently included in the LOMP) and stockpiles that have been designed based on Measured and Indicated Mineral Resources that incorporated all available Resource drilling results, a gold price of US$1,200 per ounce and mining, processing and general and administration costs derived from recent operating experience.

  1. Gold production profile

With the aim of maximising the return on funds employed at Edikan, the mining sequence of the pits along with mill feed profile has been optimised and scheduled. The result of this scheduling is that the gold production profile and resulting cash flows from Edikan remain strong for the remainder of the mine life. (Refer to Figures 2, 3 and 4 below.)

To view Figure 2: Edikan Gold Mine - scheduled monthly material movement ex-pit (tonnes), visit the following link: http://media3.marketwire.com/docs/Perseus-figure2.pdf.

To view Figure 3: Edikan Gold Mine - Monthly tonnes and grade to Mill, visit the following link: http://media3.marketwire.com/docs/Perseus-figure3.pdf.

To view Figure 4: Edikan Gold Mine - Gold Production by Pit, visit the following link: http://media3.marketwire.com/docs/Perseus-figure4.pdf.

While the development of the Esuajah South deposit is not currently included in Edikan's production profile, the risk/return equation relating to the development of this deposit using underground mining techniques would change in a higher gold price environment and therefore development of this deposit may be included in future versions of the LOMP. 

  1. Improved operating efficiencies

During calendar year 2016, Perseus invested heavily in upgrading key elements of the process plant and also establishing standby power generating capacity to ensure continuity of operations irrespective of the availability of power from the national electricity grid. These works were largely completed in the December 2016 quarter and were intended to enhance the Company's ability to deliver the updated LOMP.

Plant performance in latter part of the December 2016 Quarter, and in calendar 2017 to date confirm that forecast run time, throughput rates and gold recovery rate are readily achievable.

Average annual processing throughput rate of ore is nominally 7.3Mtpa, with throughput rates variable by material type and deposit. The processing circuit involves single stage crushing, semi-autogenous grinding, gravity recovery, flotation, regrind and CIL. Assumed run time which is the product of availability and utilisation is forecast to average 90% for the remaining life of mine

The process metallurgical recovery for gold is fixed by material type in each deposit. Gold recovery rates range from 59.5-69% for oxide ore and 86-94% for primary ore. The variable recoveries are a function of differing metallurgical properties of ores from different deposits. Recoveries by pit are as shown in Table 6.

Table 6: Metallurgical recoveries by material type and pit
Recovery by Ore Type (%)
Deposit Oxide Transition Fresh
AF Gap 61.0 73.4 88.0
Fobinso 61.0 73.4 88.0
Chirawewa 59.5 72.0 86.0
Bokitsi 69.0 78.0 87.01
Fetish 61.0 73.4 90.0
Esuajah North 61.0 73.4 93.0
Heap Leach 67.0 - -
1 Average value, the recovery for Bokitsi is variable based on the input grade
  1. Substantial decrease in sustaining capital

In the two years to December 2016, Perseus has invested heavily in a programme of capital works at Edikan that included upgrading the processing plant, installing electricity generating capacity, construction of relocation housing to house people impacted by mining operations and pre-stripping three open pits.

With the completion of this work, the amount of capital expenditure required to sustain the Edikan operation for the remaining mine life has reduced materially. Total remaining life of mine capital expenditure of US$34.5 million is forecast, including approximately US$8 million of capital to complete rehabilitation of the mine site when operations cease.

  1. Future cash flows and sensitivity analysis

Based on the LOM gold production and cost parameters, the net after tax cash flows forecast to be generated by Edikan from January 1, 2017, at US$1,200 per ounce gold price, are estimated to total US$403 million or A$0.52 per share (assuming an A$:US$ exchange rate of 0.75).

The sensitivity analysis shown below in Table 7 summarises the sensitivity of Edikan's net after tax cash flows to movements in the gold price. Within an expected short term trading range of US$1,100 per ounce to US$1,300 per ounce, the projected cash flows of the mine remain robust and capable of materially contributing to the development funding of Perseus's two growth projects, namely the Sissingué Gold Mine and the Yaouré Gold Mine, both located in Côte d'Ivoire.

Table 7: Sensitivity Edikan's After Tax Cashflow to gold price movements
Gold Price
US$1,100/ounce US$1,200/ounce US$1,300/ounce
US$319 million US$403 million US$487 million
A$0.41/share A$0.52/share A$0.63 / share

Caution Regarding Forward Looking Information:

This report contains forward-looking information which is based on the assumptions, estimates, analysis and opinions of management made in light of its experience and its perception of trends, current conditions and expected developments, as well as other factors that management of the Company believes to be relevant and reasonable in the circumstances at the date that such statements are made, but which may prove to be incorrect. Assumptions have been made by the Company regarding, among other things: the price of gold, continuing commercial production at the Edikan Gold Mine without any major disruption, development of a mine at Tengrela, the receipt of required governmental approvals, the accuracy of capital and operating cost estimates, the ability of the Company to operate in a safe, efficient and effective manner and the ability of the Company to obtain financing as and when required and on reasonable terms. Readers are cautioned that the foregoing list is not exhaustive of all factors and assumptions which may have been used by the Company. Although management believes that the assumptions made by the Company and the expectations represented by such information are reasonable, there can be no assurance that the forward-looking information will prove to be accurate. Forward-looking information involves known and unknown risks, uncertainties, and other factors which may cause the actual results, performance or achievements of the Company to be materially different from any anticipated future results, performance or achievements expressed or implied by such forward-looking information. Such factors include, among others, the actual market price of gold, the actual results of current exploration, the actual results of future exploration, changes in project parameters as plans continue to be evaluated, as well as those factors disclosed in the Company's publicly filed documents. The Company believes that the assumptions and expectations reflected in the forward-looking information are reasonable. Assumptions have been made regarding, among other things, the Company's ability to carry on its exploration and development activities, the timely receipt of required approvals, the price of gold, the ability of the Company to operate in a safe, efficient and effective manner and the ability of the Company to obtain financing as and when required and on reasonable terms. Readers should not place undue reliance on forward-looking information. Perseus does not undertake to update any forward-looking information, except in accordance with applicable securities laws.

Competent Person Statement

All production targets for Edikan referred to in this report are underpinned by estimated Ore Reserves which have been prepared by competent persons in accordance with the requirements of the JORC Code. The information in this report in relation to Edikan Mineral Resource and Ore Reserve estimates was previously published in a market release dated February 21, 2017. The Company confirms that all material assumptions underpinning those estimates and the production targets, or the forecast financial information derived therefrom, in that market release continue to apply and have not materially changed. The Company further confirms that material assumptions underpinning the estimates of Ore Reserves described in "Technical Report - Central Ashanti Gold Project, Ghana" dated May 30, 2011 continue to apply. Gary Brabham and Paul Thompson, each of whom is a Qualified Person as defined in NI 43-101 and an employee of the Company, have approved the inclusion of technical and scientific information in this report.


These press releases may also interest you

at 08:47
The Fabricator Podcast, a product of Fabricators and Manufacturers Association (FMA) and The Fabricator, North America's leading magazine for the metal forming and fabricating industry, has been recognized as a two-time Gold winner for podcasting in...

at 08:35
First Quantum Minerals Ltd. ("First Quantum" or "the Company") will release first quarter 2024 financial and operating results on Tuesday, April 23, 2024 after the close of the Toronto Stock Exchange. The Company will host a conference call and...

at 08:34
Sandstorm Gold Ltd. ("Sandstorm Gold Royalties", "Sandstorm" or the "Company") is pleased to announce that its Board of Directors has declared the Company's second quarterly cash dividend for 2024 in the amount of C$0.02 per common share to...

at 08:30
First Quantum Minerals Ltd. ("First Quantum" or the "Company") provides notice that the Annual General Meeting of shareholders of the Company will take place on May 9, 2024 at 9:00 am (EDT) online via audio webcast through the Company's website...

at 08:30
Lear Corporation will hold a conference call to review the company's first quarter 2024 financial results and related matters on April 30, 2024, at 8:30 a.m. EDT....

at 08:30
Solitario Resources Corp. ("Solitario") is pleased to report that it has discovered another high-grade gold zone on its Golden Crest project, named Sleeping Beauty. Recently received assay results from reconnaissance rock sampling of...



News published on and distributed by: