Le Lézard
Classified in: Mining industry, Business
Subject: JOINT VENTURES

MGX Minerals Announces 2.07 % Li2O and 213.96 ppm Ta Over 18.0 m at Case Lake


VANCOUVER, British Columbia, Jan. 18, 2018 (GLOBE NEWSWIRE) -- MGX Minerals Inc. ("MGX" or the "Company") (CSE:XMG) (FKT:1MG) (OTCQB:MGXMF) is pleased to report that joint venture partner Power Metals Corp. ("Power Metals") has announced drill hole assays for lithium (Li) and tantalum (Ta) mineralized intervals for the Main Dyke at Case Lake, east of Cochrane, Ontario. Significant intervals for the Main Dyke include:

Power Metals has also announced drill hole assays for the two new spodumene pegmatite dykes that were discovered down hole of the Main Dyke near the end of the 2017 drill program (Power Metals press release dated Nov. 27, 2017). The first new dyke was intersected in PWM-17-42 and 43 and then targeted to intersect it again in PWM-17-44 and 49. This new dyke is located 20-40 m down hole from the Main Dyke and 35-40 m vertical depth from the surface. The second new dyke was intersected in PWM-17-42 and 49. It is located 50 m down hole from the Main Dyke and 50-80 m vertical depth from surface. Both new dykes are open in all directions. Drilling is required to define these new dykes.

Assay highlights for the first new dyke include:

Assays for the second new dyke contain up to 343.89 ppm Ta. More drill holes intersecting this dyke are needed for a better understanding of it.

Assay highlights for assays > 0.5 % Li2O holes PWM-17-35 to 44 are given in Table 1. Drill hole collar locations are given in Table 2.

Table 1 Assay highlights for PWM-17-35 to 44.
 
Drill Hole No.IncludingFrom (m)To (m)Interval (m)Li2O (%)
weighted
average

Ta (ppm)
weighted
average

PWM-17-35 5.709.003.301.3588.49
PWM-17-35including5.707.001.302.4627.70
PWM-17-35 31.0039.008.001.17165.34
PWM-17-35including31.0035.004.001.7571.10
PWM-17-35including33.0034.001.002.26118.00
PWM-17-35 42.0043.001.000.6334.90
PWM-17-36 61.0064.003.001.02207.33
PWM-17-36including62.0063.001.002.04371.00
PWM-17-36 80.0081.001.000.5138.30
PWM-17-37 109.00110.001.001.3124.70
PWM-17-37 115.00116.001.000.85117.00
PWM-17-38 96.0097.101.102.19108.00
PWM-17-39 129.33130.511.180.9864.20
PWM-17-40 18.0036.0018.002.07213.96
PWM-17-40including20.0023.003.002.43323.33
PWM-17-40including25.0027.002.001.41663.50
PWM-17-40including27.0034.007.002.81143.33
PWM-17-40 67.0068.001.000.7630.50
PWM-17-42 65.0068.003.000.9988.33
PWM-17-42 90.6693.002.340.04343.89
PWM-17-43 67.6568.801.150.8594.10
PWM-17-44 9.0011.002.000.6038.70
PWM-17-44 54.5861.006.421.1173.00
PWM-17-44including57.0058.001.001.941.90

Drill holes intersected the pegmatite dykes at almost 90 degrees, so intervals are close to true widths.

Power Metals has an ongoing 2000 m drill program on the Northeast Dyke that started January 10th, 2018.

Quality Control
The drill core was sampled so that 1 m of the Case Batholith tonalite host rock was sampled followed by 1 m long samples of the pegmatite dyke and 1 m of the Case Batholith. The sampling followed lithology boundaries so that only one lithology unit is within a sample, except for the < 20 cm pegmatite veins in tonalite which were merged into one sample. The drill core samples were delivered to Actlabs preparation lab in Timmins by Power Metals' geologists. The core was crushed and pulverized in Timmins and then shipped to Actlabs analytical lab in Ancaster which has ISO 17025 certification. Every 20 samples included one external quartz blank, one external lithium standard and one core duplicate. The ore grade Li2O% was prepared by sodium peroxide fusion with analysis by ICP-OES with a detection limit of 0.01 % Li2O.

Case Lake
Case Lake Property is located in Steele and Case townships, 80 km east of Cochrane, NE Ontario close to the Ontario-Quebec border. The Case Lake pegmatite swarm consists of five dykes: North, Main, South, East and Northeast Dykes. The Northeast Dyke contains very coarse-grained spodumene. MGX currently has a paid up 20% working interest in Case Lake and four other lithium hard rock properties in Ontario controlled by Power Metals as well as any additional properties acquired prior to August 2020. The Company has the right to acquire an additional 15% working interest, for a total of 35%, in Case Lake Lithium and the other lithium properties by making a one-time payment of $10M prior to August 2020. The Company holds an option to acquire 10,000,000 shares of Power Metals at $0.65 (see press release dated August 2, 2017).

Qualified Person
The technical portions of this press release were reviewed by Andris Kikauka (P. Geo.), Vice President of Exploration for MGX Minerals. Mr. Kikauka is a non-independent Qualified Person within the meaning of National Instrument 43-101 Standards.

Table 2 North, Main and South Dyke 2017 drill program collar locations. UTM NAD 83, Zone 17. NQ core.
 
Drill Hole No.EastingNorthingElevation
(m)

Dip
(°)

Azimuth
(°)

Length
(m)
PWM-17-35578124.75431670.5351.94-4515080
PWM-17-36578098.75431700.7344.64-45150104
PWM-17-37578075.15431738.5343.54-45150131
PWM-17-38578064.75431701.8342.54-45150110
PWM-17-39578042.15431740.9345.05-45150140
PWM-17-40578226.85431700.5348.34-4515076
PWM-17-41578210.05431734.7339.74-45150104
PWM-17-42578242.75431708.7346.74-45150101
PWM-17-43578242.95431708.0346.34-48125101
PWM-17-44578265.95431680.0350.64-4515071

About MGX Minerals
MGX Minerals is a diversified Canadian resource company with interests in advanced material and energy assets throughout North America. Learn more at www.mgxminerals.com.

Neither the Canadian Securities Exchange nor its Regulation Services Provider (as that term is defined in the policies of the Canadian Securities Exchange) accepts responsibility for the adequacy or accuracy of this release.

Forward-Looking Statements

This press release contains forward-looking information or forward-looking statements (collectively "forward-looking information") within the meaning of applicable securities laws. Forward-looking information is typically identified by words such as: "believe", "expect", "anticipate", "intend", "estimate", "potentially" and similar expressions, or are those, which, by their nature, refer to future events. The Company cautions investors that any forward-looking information provided by the Company is not a guarantee of future results or performance, and that actual results may differ materially from those in forward-looking information as a result of various factors. The reader is referred to the Company's public filings for a more complete discussion of such risk factors and their potential effects which may be accessed through the Company's profile on SEDAR at www.sedar.com.


These press releases may also interest you

at 06:05
Spotify Technology S.A. has released its financial results for the first quarter of 2024 today. Please visit investors.spotify.com to view the Shareholder Deck and other supplemental materials. As previously announced, the company will host a live...

at 06:05
FREYR Battery ("FREYR"), a developer of next-generation battery cell production capacity, will publish a press release detailing first quarter 2024 results and conduct a conference call on May 8, 2024. The first quarter 2024 press release will be...

at 06:05
UPS today announced first-quarter 2024 consolidated revenues of $21.7 billion, a 5.3% decrease from the first quarter of 2023. Consolidated operating profit was $1.6 billion, down 36.5% compared to the first quarter of 2023, and down 31.5% on an...

at 06:05
Banc of California, Inc. : $0.17 Earnings Per Share $0.19 Adjusted Earnings Per Share(1) $17.18 Book Value Per Share $15.07 Tangible Book Value Per Share(1) 10.12% CET1 Ratio 27% Noninterest-Bearing Deposits...

at 06:00
Madison Street Capital (MSC), an international investment banking firm, acted as the exclusive advisor in the sale of Cenergy International Services, Inc. ("Cenergy") to First Tek, Inc. ("First Tek"). Founded in 1996 and headquartered in Houston,...

at 06:00
Emeren Group Ltd ("Emeren" or the "Company") (www.emeren.com) , a leading global solar project developer, owner, and operator, today announced the successful co-development agreement of 199 MW (up to 1.59GWh of capacity) of Battery Storage Projects...



News published on and distributed by: