Le Lézard
Classified in: Mining industry
Subject: MISCELLANEOUS

Cypress Development Files Resource Estimate for Clayton Valley Lithium Project, Nevada


VANCOUVER, British Columbia, June 11, 2018 (GLOBE NEWSWIRE) -- Cypress Development Corp. (TSX-V:CYP) (OTCQB:CYDVF) (Frankfurt:C1Z1) ("Cypress" or the "Company") is pleased to announce it has filed a National Instrument (NI) 43-101 Technical Report on SEDAR titled "Resource Estimate Clayton Valley Lithium Project". The Technical Report details the independent Mineral Resource Estimate for the Company's 100%-owned lithium project in Nevada, as described in the Company's press release of May 1, 2018.

Global Resource Engineering (GRE) of Denver, Colorado, prepared the Technical Report which is the first estimate of resources for Cypress' property. The report carries an Effective Date of May 1, 2018 and Issue Date of June 5, 2018. The report includes recommendations for further work including a Preliminary Economic Assessment (PEA) which GRE expects to complete in the next two months. Terre A. Lane, J. Todd Harvey, Hamid Samari, and J. J. Brown of GRE are the Qualified Persons for the report.

Highlights:

Details of the Mineral Resource Estimate

GRE estimated the Mineral Resource using a database of 23 drill holes for 1,891 metres, drilled by Cypress during 2017 and 2018. The resource was calculated using a 2.5-dimensional (2.5D) gridded model (common for layered sedimentary deposits) of six mineralized stratigraphic units, which includes a thin surficial gravel unit, and verified using a 3-dimensional (3D) block model. The mineralized intercepts in the drill holes and a 3D interpretation of the geology and intercepts were done by Terre Lane and J.J. Brown of GRE, who are Qualified Persons under NI 43-101.

Clayton Valley Lithium Project 3D Drill Hole View:
https://www.cypressdevelopmentcorp.com/site/assets/files/3573/cyp_re_3d_dh_view.jpg

All samples for the project were assayed at ALS Chemex or Bureau Veritas, both ISO-9000 certified laboratories. The resulting assay intervals were composited for the entire sedimentary unit for the 2.5D gridded model and were composited to a 5m down-hole length for the 3D estimate. Grade capping of lithium values was not required. Model grades were interpolated in Techbase using an inverse distance squared algorithm. A tonnage factor of 1.7 tonnes per cubic meter was selected based upon general published values to represent the insitu density. Indicated Mineral Resources were defined as being within 300 meters of a drill hole, with the Inferred mineralization requiring 2 drill holes within a search ellipse of 1500 x 800 metres for each unit. The major axis was orientated north-south along valley. The sedimentary units were truncated at the Angel Island volcanic package and claim boundaries.

The mineral resources reported use a cut-off grade of 300 ppm Li, reflecting a $15/tonne operating cost for mining, processing and G&A. The costs reflect a 10,000 ? 15,000 tonne per day mining operation in soft sedimentary material that does not require blasting. Cost assumptions for the cut-off grade include a delivered acid cost of $80/tonne and 100 kg acid per tonne of material processed. 

An overall lithium recovery of 80% was employed for the mineral resource based on the results from laboratory testing and confirmation leach testing at Hazen in Golden, Colorado under direction of Dr. Todd Harvey, who is Qualified Person in Metallurgy under NI 43-101 from GRE. The preliminary metallurgical examinations indicate that the claystone responds well to conventional weak acid leaching with no upstream size reduction required. Initial results indicate that lithium extractions of greater than 80% can be achieved. Expected leach conditions of 2 ? 8 hours of leaching with 5% sulfuric acid at temperatures ranging between 50 and 80 °C are anticipated.

Clayton Valley Lithium Project Leach Kinetics:
https://www.cypressdevelopmentcorp.com/site/assets/files/3573/cyp_re_preliminary_leach_kinetics-1.jpg

The preliminary leach results indicate relatively high grade pregnant leach solution (PLS) can be produced containing Li, K, Na and limited deleterious elements and a conventional downstream lithium recovery circuit should be applicable to produce saleable lithium carbonate or lithium hydroxide.

Clayton Valley Lithium Project Conceptual Production Flowsheet:
https://cypressdevelopmentcorp.com/site/assets/files/3573/cyp_re_conceptual_flowsheets.jpg

GRE concludes Cypress' Clayton Valley Lithium Project has the potential to be a major supplier of lithium products in the world, and additional work is warranted.

Table 1. Indicated and Inferred Resources

LithologyTonneGrade-ppmLi-kgLCE-kt
Indicated    
Upper Tuff58,70070741,500221
Upper Olive148,300897133,000708
Main Blue220,5001,081238,4001,269
Lower Olive132,200851112,500599
Hard Bottom136,90067392,100490
Total696,600886617,5003,287
 Inferred   
Upper Tuff65,30068945,000240
Upper Olive112,40088399,300529
Main Blue190,7001,032196,8001,048
Lower Olive149,400833124,400662
Hard Bottom125,00065782,100437
Total642,800852547,6002,916

Note: ppm = parts per million, Li = lithium metal, LCE = lithium carbonate equivalent,
kg = kilogram, kt = kilotonne

Clayton Valley Lithium Project Resource Cross Section:
https://www.cypressdevelopmentcorp.com/site/assets/files/3573/cyp_re_cross_section_2.jpg

Table 2. Resources within Initial Pit Outline

LithologyTonneGrade-ppmLi-kgLCE-kt
Indicated    
Upper Tuff22,60068615,50083
Upper Olive37,40094735,400188
Main Blue88,0001,169102,900548
Lower Olive24,50092222,600120
Hard Bottom18,90067212,70068
Total191,400988189,1001,007
 Inferred   
Upper Tuff----
Upper Olive7,2009867,10038
Main Blue11,2001,16113,00069
Lower Olive7,0009296,50035
Hard Bottom----
Total25,4001,04726,600142

Clayton Valley Lithium Project Plan View of Preliminary Pit:
https://www.cypressdevelopmentcorp.com/site/assets/files/3573/cyp_re_plan_view_of_preliminary_pitsm.jpg

CIM definitions were followed for Mineral Resources. Mineral Resources are not Mineral Reserves and do not have demonstrated economic viability. There is no certainty that all or any part of the Mineral Resources will be converted into Mineral Reserves.

Terre Lane, J.J. Brown, Hamid Samari and Dr. Todd Harvey, of GRE are the Qualified Persons as defined by National Instrument 43-101 and have approved of the technical information in this release.

About Cypress Development Corp.:

Cypress Development Corp. is a publicly traded exploration company focused on developing the Company's 100%-owned Clayton Valley lithium project in the State of Nevada, U.S.A.

Cypress' Clayton Valley Lithium Project is located immediately east of Albemarle's Silver Peak mine, North America's only lithium brine operation. Recent exploration by Cypress has discovered an extensive deposit of lithium-bearing claystone adjacent to the brine field. With mineralization tested by drilling over a seven-kilometer trend, the size of the deposit makes Clayton Valley a premier target that has the potential to impact the future of lithium production in North America.

Cypress Development Corp. has approx. 60.1 million shares issued and outstanding.

To find out more about Cypress Development Corp. (TSX-V:CYP), visit our website at www.cypressdevelopmentcorp.com.

CYPRESS DEVELOPMENT CORP.

"Dr. Bill Willoughby"
                                                           
WILLIAM WILLOUGHBY, PhD., PE
Chief Executive Officer

For further information contact myself or:
Don Myers
Cypress Development Corp.
Director, Corporate Communications
Telephone: 604-639-3851
Toll Free: 800-567-8181
Facsimile: 604-687-3119
Email: [email protected]

NEITHER THE TSX VENTURE EXCHANGE NOR ITS REGULATION SERVICES PROVIDER ACCEPTS RESPONSIBILITY FOR THE ADEQUACY OR ACCURACY OF THE CONTENT OF THIS NEWS RELEASE.

This release includes certain statements that may be deemed to be "forward-looking statements". All statements in this release, other than statements of historical facts, that address events or developments that management of the Company expects, are forward-looking statements. Although management believes the expectations expressed in such forward-looking statements are based on reasonable assumptions, such statements are not guarantees of future performance, and actual results or developments may differ materially from those in the forward-looking statements. The Company undertakes no obligation to update these forward-looking statements if management's beliefs, estimates or opinions, or other factors, should change. Factors that could cause actual results to differ materially from those in forward-looking statements, include market prices, exploration and development successes, continued availability of capital and financing, and general economic, market or business conditions. Please see the public filings of the Company at www.sedar.com for further information.


These press releases may also interest you

at 02:17
SANY Group (SANY) is taking part in the road construction project in New Zealand's Bay of Plenty, the 12th road upgrading project in New Zealand as the country embarks on major upgrades to its transport infrastructure....

at 02:00
Cornish Metals Inc. (AIM/TSX-V: CUSN) ("Cornish Metals" or the "Company"), is pleased to announce the launch of a new interactive investor hub, intended to provide stakeholders with a more proactive method of communication and enquiry support in...

at 02:00
Ecora Resources PLC (LSE:ECOR) issues the following trading update for the period 1 January to 31 March 2024.Ecora is the leading royalty company focused on supporting the supply of industrial commodities essential to creating a sustainable future....

23 avr 2024
The Annual General Meeting and the Extraordinary General Meeting agreed in the nomination committee's proposal. Mr. Dag J. Opedal was therefore elected to become the new Chair of the Board of HydrogenPro ASA. The new board consists primarily of...

23 avr 2024
In June, SUPCON (688777) is poised to launch two groundbreaking products in Singapore: the world's first UCS (Universal Control System) and TPT (Time-Series Pre-trained Transformer), the first time-series model in the process industry. UCS, a...

23 avr 2024
Mirasol Resources Ltd. (the "Company" or "Mirasol") is pleased to announce the closing of the first tranche of its previously announced non-brokered private placement. The Company issued 3,887,552 Units (the "Units") at a price of $0.60 per Unit...



News published on and distributed by: