Le Lézard
Classified in: Mining industry, Business
Subject: EARNINGS PROJECTIONS

Trevali Reports Record Preliminary Q4-2017 and 2017 Annual Production, and Provides 2018 Production and Cost Guidance


VANCOUVER, BRITISH COLUMBIA--(Marketwired - Jan. 15, 2018) - Trevali Mining Corporation ("Trevali" or the "Company") (TSX:TV)(LMA:TV)(OTCQX:TREVF)(FRANKFURT:4TI) reports preliminary consolidated fourth quarter ("Q4") 2017 production of 104.8-million payable pounds of zinc, 13.5-million payable pounds of lead and 396,899 payable ounces of silver. Preliminary 2017 annual production was 177.4-million payable pounds of zinc, 45.8-million payable pounds of lead and 1,561,508 payable ounces of silver.

Table 1: 2017 Preliminary Consolidated Production
  Q4-2017 Q4-2016 2017(1) 2016
Tonnes Mined 832,878 415,523 1,924,383 1,166,381
Tonnes Milled 818,690 469,723 2,070,442 1,300,037
Concentrate Produced DMT (Dry Metric Tonnes):        
  Zinc 113,284 42,275 198,550 110,027
  Lead 15,442 13,284 53,784 34,335
Payable Production:        
  Zinc (million lbs) 104.8 36.8 177.4 98.0
  Lead (million lbs) 13.5 11.3 45.8 33.0
  Silver (000 ozs) 396.9 409.7 1,561.5 1,215,9
(1) 2017 preliminary production includes September-December 2017 production from Perkoa and Rosh Pinah reflecting the closure of the African zinc asset acquisition from Glencore on August 31, 2017. Production from April 1 to August 31, 2017 was treated as part of the working capital adjustments captured in the purchase price calculation.

Q4-2017 and 2017 Annual Operational Highlights

"2017 marked a transformational year for Trevali with the acquisition of the Perkoa and Rosh Pinah zinc mines, elevating the Company to a Top-10 zinc producer," stated Dr. Mark Cruise, Trevali's President and CEO. "These new assets have contributed significantly to Trevali's production profile, leading to record quarterly and annual production, and we anticipate additional improvements through an ongoing focus on operational excellence in 2018."

Santander Mine, Peru

Preliminary Q4-2017 production was 14.1 million payable pounds of zinc, 1.7 million payable pounds of lead and 97,941 payable ounces of silver (see Table 2). Recoveries averaged 87% for zinc, 78% for lead and 57% for silver.

Santander mill throughput for Q4-2017 was 214,791 tonnes, approximately 17% above nameplate design capacity. Mine production the quarter was 201,198 tonnes.

The Company has completed the upgrade of its pumping infrastructure to facilitate long-range planning as mining transitions deeper in the Magistral zones. It is anticipated to result in reduced power requirements and improve overall mine efficiency.

Table 2: Santander 2017 Preliminary Production Statistics  
  Q4-2017   Q4-2016   2017   2016  
Tonnes Mined 201,198   171,084   681,785   716,893  
Tonnes Milled 214,791   218,481   839,546   863,307  
Average Head Grades:                
  Zinc 4.1 % 4.4 % 3.9 % 4.3 %
  Lead 0.5 % 0.8 % 0.7 % 1.2 %
  Silver - ounces/ton 0.8   1.2   1   1.3  
Average Recoveries:                
  Zinc 87 % 89 % 87 % 89 %
  Lead 78 % 83 % 80 % 86 %
  Silver 57 % 66 % 64 % 71 %
Concentrate Produced DMT:                
  Zinc 16,286   17,553   60,841   67,397  
  Lead 1,712   3,111   10,792   17,189  
Payable Production:                
  Zinc (million lbs) 14.1   15.8   53.1   61.3  
  Lead (million lbs) 1.7   3.1   10.5   19.3  
  Silver (000 ozs) 97.9   177.9   602.7   813.8  

The Phase-1 2017 Santander exploration drill program commenced during the second quarter, utilizing both surface directional and underground drill rigs, with the aim of converting inferred tonnages into higher confidence categories as well as aggressively probing the depth and lateral extents of the Magistral and Santander polymetallic systems that remain open for expansion. Results of the work will support long-range mine planning, and follow up conversion and expansion drilling is planned for 2018.

Caribou Mine, Canada

Preliminary Q4-2017 Caribou production was a record 21.7 million pounds of payable zinc, 8.7 million payable pounds of lead and 249,643 payable ounces of silver (see Table 3). Both mine output and mill throughput for the quarter established new highs of 250,225 tonnes and 252,857 tonnes respectively.

Ongoing transition to owner mining has enabled productivity improvements including the reduction of stope dilution below 10%. Other key initiatives saw the stabilization of zinc recoveries with significant improvement lead and silver compared to the same period in 2016.

Table 3: Caribou 2017 Preliminary Production Statistics  
  Q4-2017   Q4-2016   2017   2016  
Tonnes Mined 250,225   244,439   937,459   449,488  
Tonnes Milled 252,857   251,242   945,436   436,730  
Average Head Grades:                
  Zinc 6.0 % 6.0 % 5.9 % 6.0 %
  Lead 2.6 % 2.7 % 2.6 % 2.7 %
  Silver - ounces/ton 2.3   2.3   2.2   2.3  
Average Recoveries:                
  Zinc 78 % 76 % 77 % 77 %
  Lead 66 % 60 % 63 % 58 %
  Silver 40 % 36 % 39 % 36 %
Concentrate Produced (DMT):                
  Zinc 25,021   24,722   90,580   42,630  
  Lead 10,644   10,173   38,706   17,146  
Payable Production:                
  Zinc (million lbs) 21.7   20.9   79.9   36.7  
  Lead (million lbs) 8.7   8.2   30.9   13.8  
  Silver (000 ozs) 249.6   231.7   890.3   402.1  

Rosh Pinah Mine, Namibia

Preliminary Q4-2017 Rosh Pinah production was 21.3 million pounds of payable zinc, 3.1 million payable pounds of lead and 49,217 payable ounces of silver (see Table 4). Mine output and mill throughput for the quarter was 177,820 tonnes and 171,020 tonnes respectively.

During the quarter, reported recoveries were affected by a one-time reconciliation adjustment due to unusual patterns of concentrate stockpiling. Procedures are being taken to ensure more frequent reconciliations of material movements are completed.

Table 4: Rosh Pinah 2017 Preliminary Production Statistics (100% basis)  
  Sep-17   Q4-2017   2017(1)  
Tonnes Mined 60,045   177,820   237,865  
Tonnes Milled 56,630   171,020   227,650  
Average Head Grades:            
  Zinc 8.7 % 8.4 % 8.5 %
  Lead 1.9 % 1.4 % 1.6 %
  Silver - ounces/ton 0.7   0.5   0.6  
Average Recoveries:            
  Zinc 87 % 80 % 82 %
  Lead 58 % 60 % 60 %
  Silver 50 % 52 % 51 %
Concentrate Produced (DMT):            
  Zinc 7,840   23,399   31,239  
  Lead 1,200   3,086   4,286  
Payable Production:            
  Zinc (million lbs) 8.0   21.3   29.3  
  Lead (million lbs) 1.3   3.1   4.4  
  Silver (000 ozs) 19.2   49.3   68.5  
(1) 2017 preliminary production include September-December 2017 production from the Perkoa and Rosh Pinah, reflecting the closure of the African zinc asset acquisition from Glencore on August 31, 2017.

Improvement programs have been implemented to target key operational opportunities, including production drilling support, trial of raise-boring in the stope production cycle and mobile fleet rationalization. These initiatives are delivering improvements to the site and will be ongoing through 2018. Planned sequencing changes resulted in higher grades being mined and processed.

Perkoa Mine, Burkina Faso

Preliminary Q4-2017 Perkoa production was a record 47.7 million pounds of payable zinc with an average zinc recovery of 94%, the highest levels to date (see Table 5). Mine output and mill throughput for the quarter were 203,635 tonnes and 180,022 tonnes respectively. The re-introduction of the zinc regrind mill to the circuit has realized improvements in zinc concentrate grades compared to prior months.

Table 5: Perkoa 2017 Preliminary Production Statistics (100% basis)  
  Sep-17   Q4-2017   2017 (1)  
Tonnes Mined 67,274   203,635   270,909  
Tonnes Milled 57,810   180,022   237,832  
Average Zinc Head Grade 15.2 % 15.0 % 15.0 %
Average Zinc Recovery 92.0 % 94.0 % 93.7 %
Zinc Concentrate Produced (DMT) 15,890   48,579   64,469  
Payable Zinc Production (million lbs) 15.1   47.7   62.8  
(1) 2017 preliminary production includes September-December 2017 production from Perkoa and Rosh Pinah, reflecting the closure of the African zinc asset acquisition from Glencore on August 31, 2017.

2018 CONSOLIDATED PRODUCTION AND COST GUIDANCE (all costs in US$)

Consolidated production guidance for 2018 is estimated between 400 and 427 million pounds of payable zinc, 43.8 and 46.0 million pounds of payable lead and 1.4 and 1.47 million ounces of payable silver. Consolidated operating costs will range from $60-$66 per tonne, with cash costs (net of by-product credits) of between $0.67-$0.73 per pound of zinc (see Table 6).

Table 6: 2018 Consolidated Production and Cost Guidance (2 & 4)

Mine 2018 Zinc
 Production
(million pounds payable)
2018 Lead
 Production
(million pounds payable)
2018 Silver
 Production
(000 ounces payable)
Operating Costs
(per tonne)
Cash Costs net
 of By-Products
(3)
(per lb Zn)
Caribou 86-90 27.1-28.4 627-658 $55-$61 $0.68-$0.74
Perkoa (100%)(4) 155-165 N/A N/A $103-$113 $0.82-$0.91
Rosh Pinah (100%)(4) 105-115 5.7-6.0 123-129 $49-$54 $0.55-$0.60
Santander 54-57 11.0-11.6 654-687 $38-$42 $0.49-$0.53
Total 400-427 43.8-46.0 1,400-1,474 $60-$66 $0.67-$0.73
(2) Constitutes forward-looking information; see "Cautionary Note Regarding Forward Looking Statements".
(3) Cash costs are based on various assumptions and estimates, including, but not limited to: production volumes, commodity prices (Zn: $1.25/lb Pb: $1.00/lb Ag: $19/lb) and foreign currency exchange rates (N$/USD: 13.00; XOF/USD: 609; PEN/USD 3.25; C$/USD $1.25).
(4) Trevali's interest is 90% of Perkoa and 80% of Rosh Pinah.

Production guidance has been provided on an annual basis but we expect moderate production fluctuations on a quarter-to-quarter basis due to mine scheduling, with modestly lower first quarter production versus the balance of the year.

Caribou 2018 Guidance:

Debottlenecking of the mine and mill has produced continued operational improvements since the declaration of commercial production mid-2016. The 2018 business improvement program will continue with production anticipated to increase further as improvements are made to the power infrastructure, control systems, mining conversion, ground control management and ventilation.

Perkoa 2018 Guidance:

A key initiative at Perkoa in 2017 was to re-commission the zinc regrind mill, which was completed in the fourth quarter, with positive impacts on recovery and concentrate grades. These benefits are expected to continue in 2018.

Rosh Pinah 2018 Guidance:

The installation of improved grinding capacity in 2017 is already producing results at or above modelled expectations. Improvements in mine planning and underground drilling support has increased the mine production capacity.

Santander 2018 Guidance:

Production represents a modest improvement from 2017, based on improved ore availability from areas impacted by water in 2017. Significant investments were made to the mine pumping infrastructure in 2017. Mill maintenance in the first quarter (head of ball mill replacement on one of the four mills) will result in lower mill throughput, with mined ore stockpiled for processing in subsequent quarters.

Exploration - Targeting Resource and Reserve Growth and Mine Life Extensions

Trevali recently commenced an accelerated growth initiative at its four mines. This initiative will focus on brownfield exploration targets to expand and discover new mineral resources in proximity to existing mine infrastructure that have the potential to increase production, lower unit costs, increase cash flows and extend the current mine lives. For 2018, the Company expects to invest over $10 million, primarily focused on:

Capital Expenditures

Capital expenditures for 2018 are expected to be approximately $74 million, comprised of the following:

2018 Capital Expenditure Guidance (US$)
Sustaining Capex $41 million
Exploration $10 million
Infrastructure $23 million
  $74 million

Integration Update

Corporate and Business Unit technical, financial and strategic integration continues to progress well with the team focusing on streamlining reporting systems and cost savings from supply chain and technical support initiatives. The main objective being improving efficiencies within group reporting, procurement, information technology, embedding a continuous operational improvement culture and positioning Trevali for future growth through its respective business development strategies and to deliver on cost effective production targets.

Qualified Person and Quality Control/Quality Assurance

EurGeol Dr. Mark D. Cruise, Trevali's President and CEO, is a qualified person as defined by NI 43-101, have supervised the preparation of and have verified the scientific and technical information that forms the basis for this news release. Dr. Cruise is not independent of the Company as he is an officer, director and shareholder.

ABOUT TREVALI MINING CORPORATION

Trevali is a zinc-focused, base metals company with four mines: the wholly-owned Santander mine in Peru, the wholly-owned Caribou mine in the Bathurst Mining Camp of northern New Brunswick, its 80% owned Rosh Pinah mine in Namibia and its 90% owned Perkoa mine in Burkina Faso.

The shares of Trevali are listed on the TSX (symbol TV), the OTCQX (symbol TREVF), the Lima Stock Exchange (symbol TV), and the Frankfurt Exchange (symbol 4TI). For further details on Trevali, readers are referred to the Company's website (www.trevali.com) and to Canadian regulatory filings on SEDAR at www.sedar.com.

On Behalf of the Board of Directors of TREVALI MINING CORPORATION

Mark D. Cruise, President

Cautionary Note Regarding Forward-Looking Statements

This news release contains "forward-looking statements" within the meaning of the United States Private Securities Litigation Reform Act of 1995 and "forward-looking information" within the meaning of applicable Canadian securities legislation. Statements containing forward-looking information express, as at the date of this news release, the Company's plans, estimates, forecasts, projections, expectations, or beliefs as to future events or results and the Company does not intend, and does not assume any obligation to, update such statements containing the forward-looking information. Such forward-looking statements and information include, but are not limited to statements as to: the accuracy of estimated Mineral Resources, anticipated results of future exploration, and forecast future metal prices, expectations that environmental, permitting, legal, title, taxation, socio-economic, political, marketing or other issues will not materially affect estimates of Mineral Resources. These statements reflect the Company's current views with respect to future events and are necessarily based upon a number of assumptions and estimates that, while considered reasonable by the Company, are inherently subject to significant business, economic, competitive, political and social uncertainties and contingencies.

Many factors, both known and unknown, could cause actual results, performance or achievements to be materially different from the results, performance or achievements that are or may be expressed or implied by such forward-looking statements contained in this news release and the Company has made assumptions and estimates based on or related to many of these factors. Such factors include, without limitation: fluctuations in spot and forward markets for silver, zinc, base metals and certain other commodities (such as natural gas, fuel oil and electricity); fluctuations in currency markets; risks related to the technological and operational nature of the Company's business; changes in national and local government, legislation, taxation, controls or regulations and political or economic developments in Canada, the United States, Peru, Namibia, Burkina Faso, or other countries where the Company may carry on business in the future; risks and hazards associated with the business of mineral exploration, development and mining (including environmental hazards, industrial accidents, unusual or unexpected geological or structural formations, pressures, cave-ins and flooding); risks relating to the credit worthiness or financial condition of suppliers, refiners and other parties with whom the Company does business; inadequate insurance, or inability to obtain insurance, to cover these risks and hazards; employee relations; relationships with and claims by local communities and indigenous populations; availability and increasing costs associated with mining inputs and labour; the speculative nature of mineral exploration and development, including the risks of obtaining necessary licenses and permits and the presence of laws and regulations that may impose restrictions on mining; diminishing quantities or grades of mineral resources as properties are mined; global financial conditions; business opportunities that may be presented to, or pursued by, the Company; the Company's ability to complete and successfully integrate acquisitions and to mitigate other business combination risks; challenges to, or difficulty in maintaining, the Company's title to properties and continued ownership thereof; the actual results of current exploration activities, conclusions of economic evaluations, and changes in project parameters to deal with unanticipated economic or other factors; increased competition in the mining industry for properties, equipment, qualified personnel, and their costs. Investors are cautioned against attributing undue certainty or reliance on forward-looking statements.

Although the Company has attempted to identify important factors that could cause actual results to differ materially, there may be other factors that cause results not to be as anticipated, estimated, described or intended. The Company does not intend, and does not assume any obligation, to update these forward-looking statements or information to reflect changes in assumptions or changes in circumstances or any other events affecting such statements or information, other than as required by applicable law.

We advise US investors that while the terms "Measured Mineral Resources", "Indicated Mineral Resources" and "Inferred Mineral Resources" are recognized and required by Canadian regulations, the US Securities and Exchange Commission does not recognize these terms. US investors are cautioned not to assume that any part or all of the material in these categories will ever be converted into reserves.


These press releases may also interest you

at 20:00
OKX Ventures, the investment arm of leading crypto exchange and Web3 technology company OKX, today announced its participation in the 'Runes Incubator.' This program, initiated by OnePiece Labs and supported by Merlin Chain and Franklin Templeton,...

at 20:00
SK hynix Inc. (or "the company", www.skhynix.com) announced today that it has recently signed a memorandum of understanding with TSMC for collaboration to...

at 19:57
WHY: Rosen Law Firm, a global investor rights law firm, reminds purchasers of securities of HireRight Holdings Corporation pursuant and/or traceable to the registration statement and prospectus (collectively, the "Offering Documents") issued in...

at 19:55
AZINCOURT ENERGY CORP. ("Azincourt" or the "Company") , is pleased to announce a non-brokered private placement to raise gross proceeds of up to C$375,000 consisting of flow-through units (the "FT Units") offered at a price of $0.035 per FT Unit (the...

at 19:30
Attorney Advertising-- Bronstein, Gewirtz & Grossman, LLC, a nationally recognized law firm, notifies investors that a class action lawsuit has been filed against Doximity, Inc. ("Doximity" or "the Company") and certain of its officers....

at 19:27
ShipSaving, a fast-growing shipping platform recognized in the 2023 Deloitte Technology Fast 500tm, proudly announces a groundbreaking development as the first multi-carrier shipping company to offer UPS no-label shipping. This innovative feature...



News published on and distributed by: