Le Lézard
Classified in: Mining industry, Business
Subject: MINING DRILLING RESULTS

Arizona Mining Reports Additional High Grade in Taylor Deeps Zone


VANCOUVER, BC--(Marketwired - February 21, 2017) - Arizona Mining Inc. (TSX: AZ) ("Arizona Mining" or the "Company") announces the results of five (5) exploration drill holes from its current program on the Taylor zinc-lead-silver sulfide deposit located on its 100%-owned Hermosa Project in Santa Cruz County, Arizona. This brings the total number of drill holes reported in the 2016-2017 program to sixty-seven (67).

HDS-418 is a vertical hole drilled to infill an area in the central portion of the previously reported resource area. The hole intersected one (1) mineralized vein hosted in the upper volcanics and nine (9) distinct mineralized horizons in the Taylor Sulfide zone ("TS"). The Taylor Sulfide intervals have a total cumulative mineralized thickness of 424.5 feet (refer to Table I). In addition, two (2) very significant intervals were intersected in the Taylor Deeps Sulfide ("TDS") zone. Some of the best results in the hole included:

HDS-417 is a vertical hole drilled to infill an area in the central portion of the previously reported resource area. The hole intersected three (3) mineralized veins hosted in the volcanics and five (5) distinct mineralized horizons in the Taylor Sulfide zone. The Taylor Sulfide intervals have a total cumulative mineralized thickness of 239.5 feet (refer to Table I). In addition, one (1) very significant interval was intersected in the Taylor Deeps Sulfide zone. Some of the best results in the hole included:

HDS-408 is a vertical infill drill hole within the previously reported mineral resource. The drill hole encountered three (3) mineralized veins in the volcanics, five (5) mineralized horizons within the Taylor Sulfide zone and two (2) mineralized horizons in the Taylor Deeps Sulfide zone. When added together, the Taylor Sulfide zone intervals have a cumulative thickness of 325.5 feet (refer to Table I). Most notable among the mineralized horizons are:

HDS-409 is a vertical infill drill hole that intersected two (2) mineralized veins in the lower volcanic sequence and six (6) mineralized horizons in the Taylor Sulfide zone. When added together, the Taylor Sulfide zone intervals have a cumulative thickness of 502 feet (refer to Table I). Most notable among the mineralized horizons are as follows:

HDS-411 is a vertical infill drill hole along the northeast edge of the previously reported mineral resource. The drill hole encountered seven (7) mineralized horizons within the Taylor Sulfide zone and two (2) mineralized horizons in the Taylor Deeps Sulfide zone. When added together, the Taylor Sulfide zone intervals have a cumulative thickness of 212 feet (refer to Table I). Most notable among the mineralized horizons includes:

For a full list of the vein, Taylor Sulfide and Taylor Deeps Sulfide mineralized intervals from these holes please refer to Table I.

CEO Jim Gowans commented: "Our drilling continues to expand the Taylor Deeps Sulfide zone and demonstrate great continuity within the Taylor Sulfide resource area. We have been very pleased with the results to date leading up to the revised resource and the PEA, both of which will be released by the end of Q1."

DH_ID  From (feet)  To (feet)  Interval (in feet)  From (meters)  To (meters)  Interval (meters)  Ag opt  Pb%  Zn%  Cu%  Zone*
HDS-408  1140  1165  25  347.5  355.1  7.6  0.69  1.43  1.35  0.01  Vein
HDS-408  1344  1392  48  409.6  424.3  14.6  3.77  8.51  13.06  0.26  TS
HDS-408  1937  2019.5  82.5  590.4  615.5  25.1  5.07  13.83  18.16  0.11  TS
Including  1942  1996  54  591.9  608.4  16.5  6.71  18.52  24.55  0.14  TS
HDS-408  2624.5  2712.5  88  799.9  826.7  26.8  0.69  1.97  2.05  0.02  TS
HDS-408  2827  2872  45  861.6  875.3  13.7  0.22  0.71  1.28  0.00  TS
HDS-408  3017  3079  62  919.5  938.4  18.9  0.73  2.09  1.42  0.02  TS
HDS-408  3119  3134.5  15.5  950.6  955.3  4.7  1.80  2.82  1.48  0.03  Vein
HDS-408  3340.5  3347  6.5  1018.1  1020.1  2.0  2.45  5.36  1.03  0.10  Vein
HDS-408  3375  3477  102  1028.6  1059.7  31.1  0.72  1.57  1.28  0.11  TDS
HDS-408  3507  3515  8  1068.9  1071.3  2.4  1.88  3.16  3.93  0.77  TDS
                                  
HDS-409  1370.5  1437  66.5  417.7  438.0  20.3  2.19  2.13  3.00  0.08  TS
HDS-409  1980.5  2100  119.5  603.6  640.0  36.4  1.45  2.34  3.58  0.11  TS
Including  2037  2051  14  620.8  625.1  4.3  3.05  6.99  10.73  0.17  TS
HDS-409  2212  2225  13  674.2  678.1  4.0  0.79  1.95  2.66  0.05  TS
HDS-409  2276.5  2402  125.5  693.8  732.1  38.3  3.63  6.84  2.10  0.08  TS
Including  2322.5  2348  25.5  707.9  715.6  7.8  11.86  20.22  3.14  0.28  TS
HDS-409  2481  2500  19  756.2  762.0  5.8  1.93  6.56  8.17  0.03  TS
HDS-409  2598.5  2757  158.5  792.0  840.3  48.3  0.92  3.02  3.22  0.03  TS
Including  2708.5  2757  48.5  825.5  840.3  14.8  1.55  4.90  5.71  0.07  TS
HDS-409  2797  2807  10  852.5  855.5  3.0  1.71  5.56  3.07  0.02  Vein
HDS-409  3273  3277  4  997.6  998.8  1.2  13.74  0.92  1.07  0.20  Vein
                                  
HDS-411  1063  1078  15  324.0  328.6  4.6  1.13  1.03  1.65  0.04  TS
HDS-411  1708  1737  29  520.6  529.4  8.8  0.73  1.60  1.53  0.07  TS
HDS-411  1793  1823  30  546.5  555.6  9.1  0.73  2.09  2.43  0.07  TS
HDS-411  1863  1878.5  15.5  567.8  572.5  4.7  2.14  2.33  1.70  0.60  TS
HDS-411  2527  2615  88  770.2  797.0  26.8  1.00  2.94  3.90  0.05  TS
Including  2558  2581  23  779.6  786.7  7.0  2.27  6.58  9.14  0.15  TS
HDS-411  2732  2755  23  832.7  839.7  7.0  1.04  3.21  2.58  0.02  TS
HDS-411  2794  2805.5  11.5  851.6  855.1  3.5  1.33  3.99  2.63  0.01  TS
HDS-411  3129.5  3150.5  21  953.8  960.2  6.4  1.82  5.22  3.85  0.02  TDS
HDS-411  3189.5  3228  38.5  972.1  983.8  11.7  0.82  2.07  2.22  0.03  TDS
                                  
HDS-417  1617  1621.5  4.5  492.8  494.2  1.4  3.44  4.39  2.83  0.16  Vein
HDS-417  1897  1912  15  578.2  582.7  4.6  2.80  1.59  2.01  0.29  TS
HDS-417  2093  2128  35  637.9  648.6  10.7  1.04  3.48  4.82  0.11  TS
HDS-417  2232.5  2250  17.5  680.4  685.8  5.3  2.40  6.59  6.52  0.06  TS
HDS-417  2692  2767  75  820.5  843.3  22.9  0.92  2.75  3.10  0.01  TS
HDS-417  2821  2918  97  859.8  889.4  29.6  1.56  5.03  3.90  0.04  TS
HDS-417  3242  3247  5  988.1  989.6  1.5  101.35  1.97  0.99  1.36  Vein
HDS-417  3276  3292  16  998.5  1003.4  4.9  12.09  0.69  0.43  0.17  Vein
HDS-417  3372.5  3432  59.5  1027.9  1046.0  18.1  4.57  14.00  6.89  0.43  TDS
Including  3372.5  3392  19.5  1027.9  1033.8  5.9  7.61  23.16  7.64  0.41  TDS
                                  
HDS-418  887  889.5  2.5  270.3  271.1  0.8  11.70  8.95  13.05  1.23  Vein
HDS-418  1027  1041  14  313.0  317.3  4.3  0.97  2.07  3.76  0.02  TS
HDS-418  2148.5  2194  45.5  654.8  668.7  13.9  1.24  2.44  3.03  0.06  TS
HDS-418  2217  2271  54  675.7  692.2  16.5  1.01  2.57  3.01  0.07  TS
HDS-418  2642  2667  25  805.2  812.9  7.6  0.86  2.56  2.90  0.01  TS
HDS-418  2743  2755  12  836.0  839.7  3.7  0.79  2.41  2.01  0.02  TS
HDS-418  2841  2875  34  865.9  876.3  10.4  1.14  3.69  4.05  0.02  TS
HDS-418  2946  3023  77  897.9  921.4  23.5  0.94  2.71  2.78  0.01  TS
HDS-418  3047  3102  55  928.7  945.4  16.8  1.02  2.39  1.02  0.01  TS
HDS-418  3130  3238  108  954.0  986.9  32.9  8.44  4.00  0.63  0.08  TS
Including  3192  3235  43  972.9  986.0  13.1  19.91  7.54  1.05  0.20  TS
HDS-418  3397  3417  20  1035.4  1041.5  6.1  3.85  11.72  10.02  0.13  TDS
HDS-418  3477  3549  72  1059.7  1081.7  21.9  1.32  3.23  3.39  0.52  TDS
Including  3504  3527  23  1068.0  1075.0  7.0  2.03  4.87  7.05  1.22  TDS

*TS (Taylor Sulfides)
*TDS (Taylor Deeps Sulfides)

Table I. ASSAY SUMMARIES FOR HDS-408, HDS-409, HDS-411, HDS-417 & HDS-418

Drill intersections with a combined zinc and lead grade of greater than 9% are bolded. Sulfide drill intervals are down-the-hole drill widths but are considered to be within +/- 5% of true width based on the dip of the mineralized stratigraphy at 22 degrees. The exception to this are the intervals noted as veins. It is not possible to determine the true width of the veins based on the drill density and no representation is made here regarding true width of the veins.

Qualified Person

The results of the Arizona Mining Inc. drilling have been reviewed, verified and compiled by Donald R. Taylor, MSc., PG, Chief Operating Officer for Arizona Mining Inc., a qualified person as defined by National Instrument 43-101 (NI 43-101). Mr. Taylor has more than 25 years of mineral exploration and mining experience, and is a Registered Professional Geologist through the SME (registered member #4029597).

Assays and Quality Assurance/Quality Control

To ensure reliable sample results, the Company has a rigorous QA/QC program in place that monitors the chain-of-custody of samples and includes the insertion of blanks, duplicates, and certified reference standards at statistically derived intervals within each batch of samples. Core is photographed and split in half with one-half retained in a secured facility for verification purposes.

Sample preparation (crushing and pulverizing) has been performed at ALS Minerals Laboratories, an ISO/IEC accredited lab located in Tucson, Arizona. ALS Minerals Laboratories prepares a pulp of all samples and sends the pulps to their analytical laboratory in Vancouver, B.C. Canada for analysis. ALS analyzes the pulp sample by ICP following a 4-acid digestion (ME-ICP61 for 33 elements) including Cu (copper), Pb (lead), and Zn (zinc). All samples in which Cu (copper), Pb (lead), or Zn (zinc) are greater than 10,000 ppm are rerun using four acid digestion with an ICP - AES finish (Cu-OG62; Pb-OG62; and Zn-OG62) with the elements reported in percentage (%). Silver values are determined by ICP (ME-ICP61) with all samples with silver values greater than 100 ppm repeated using four acid digestion with an ICP-AES finish (Ag-OG62) calibrated for higher levels of silver contained. Any values over 1,500 ppm Ag trigger a fire assay with gravimetric finish analysis. Gold values are determined by a 30 gm fire assay with an ICP-AES finish (Au-ICP21).

About Arizona Mining

Arizona Mining Inc. (an augustagroup company) is a Canadian mineral exploration and development company focused on the exploration and development of its 100%-owned Hermosa Project located in Santa Cruz County, Arizona. The Taylor Deposit, a zinc-lead-silver carbonate replacement deposit, has a resource of 31.1 million tons in the Indicated Mineral Resource category grading 10.9% zinc equivalent ("ZnEq") and 82.7 million tons in the Inferred Mineral Resource category grading 11.1% ZnEq both utilizing a 4% ZnEq cutoff grade calculated in accordance with NI 43-101 guidelines (refer to the Company's news release dated October 31, 2016). The Taylor Deposit remains open to the north, west and south over land controlled by the Company and will be aggressively drilled to test the limits of the resource. The Company's other project on the Hermosa property is the Central Deposit, a silver-manganese manto oxide project.

Cautionary Note Regarding Forward-Looking Information

Certain information contained in this press release constitutes forward-looking statements. All statements, other than statements of historical facts, are forward looking statements including statements with respect to the Company's intentions for its Hermosa Project in Arizona, including, without limitation, performing additional drilling and metallurgical testwork on the Taylor Deposit. Forward-looking statements are often, but not always, identified by the use of words such as may, will, seek, anticipate, believe, plan, estimate, budget, schedule, forecast, project, expect, intend, or similar expressions.

The forward-looking statements are based on a number of assumptions which, while considered reasonable by Arizona Mining, are subject to risks and uncertainties. In addition to the assumptions herein, these assumptions include the assumptions described in Arizona Mining's management's discussion and analysis for the year ended December 31, 2015 ("MD&A"). Arizona Mining cautions readers that forward-looking statements involve and are subject to known and unknown risks, uncertainties and other factors which may cause actual results, performance or achievements to differ materially from those expressed in or implied by such forward-looking statements and forward-looking statements are not guarantees of future results, performance or achievement. These risks, uncertainties and factors include general business, economic, competitive, political, regulatory and social uncertainties; actual results of exploration activities and economic evaluations; fluctuations in currency exchange rates; changes in project parameters; changes in costs, including labour, infrastructure, operating and production costs; future prices of zinc, lead, silver and other minerals; variations of mineral grade or recovery rates; operating or technical difficulties in connection with exploration, development or mining activities, including the failure of plant, equipment or processes to operate as anticipated; delays in completion of exploration, development or construction activities; changes in government legislation and regulation; the ability to maintain and renew existing licenses and permits or obtain required licenses and permits in a timely manner; the ability to obtain financing on acceptable terms in a timely manner; contests over title to properties; employee relations and shortages of skilled personnel and contractors; the speculative nature of, and the risks involved in, the exploration, development and mining business; and the factors discussed in the section entitled "Risks and Uncertainties" in the MD&A.

Although Arizona Mining has attempted to identify important risks, uncertainties and other factors that could cause actual performance, achievements, actions, events, results or conditions to differ materially from those expressed in or implied by the forward-looking information, there may be other risks, uncertainties and other factors that cause performance, achievements, actions, events, results or conditions to differ from those anticipated, estimated or intended. Unless otherwise indicated, forward-looking statements contained herein are as of the date hereof and Arizona Mining disclaims any obligation to update any forward-looking statements, whether as a result of new information, future events or results or otherwise, except as required by applicable law.

Image Available: http://www.marketwire.com/library/MwGo/2017/2/21/11G130867/Images/Drill_Hole_Location_Map-b065533fde939b35816dda6321abec54.jpg


These press releases may also interest you

28 mar 2024
Discovery Silver Corp. ("Discovery" or the "Company") today announced financial results for the three and twelve months ended December 31, 2023 ("Q4 2023" and "2023", respectively). The Company also provided a summary of key events since the...

28 mar 2024
Osisko Development Corp. ("Osisko Development" or the "Company") reports its financial and operating results for the three and twelve months ended December 31, 2023 ("Q4 2023"). Q4 2023 HIGHLIGHTS Operating, Financial and Corporate Updates: 2,090...

28 mar 2024
Kootenay Silver Inc. ("Kootenay" or the "Company") is pleased to announce that it has obtained a receipt for a final short form base shelf prospectus with the securities regulators in each province and territory of Canada....

28 mar 2024
Robex Resources Inc. ("Robex" or the "Company") announces today that its Board of Directors has approved the implementation of the consolidation of the issued and outstanding common shares of the Company approved by its shareholders on June 29,...

28 mar 2024
Denison Mines Corp. ('Denison' or the 'Company') is pleased to announce that it has filed its 2023 Annual Report on Form 40-F with the U.S. Securities and Exchange Commission ('SEC').  Denison's Form 40-F includes its management discussion and...

28 mar 2024
Cool Company Ltd. ("CoolCo" or the "Company") announces that it has filed its Form 20-F for the year ended December 31, 2023 with the Securities and Exchange Commission (SEC) in the U.S. Form 20-F can be downloaded from the link below, is available...



News published on and distributed by: